West Des Moines, IA Solar Energy: Panel Permits (2026)
Key Facts
- Governing section
- West Des Moines City Code § 9-14-14.C.2
- Single-family/open space approval
- Building permit required
- Other zoning districts
- Site plan or site plan modification
- Systems per lot
- One, unless City Council approves more
- Abandonment rule
- Nonfunctional for 1 year must be removed
- Large system cap
- Barred over 15 kW in Open Space/single-family, limited exceptions
- Utility-scale systems
- Not allowed anywhere in the City
Summary
In the City of West Des Moines, installing a solar energy system requires City approval under Zoning Code section 9-14-14. A single-family home in a residential district needs a building permit, while most other properties need a site plan or site plan modification, and the owner must also secure any other federal, state or local permits before erecting the system.
2. Permit Required: ... It shall be unlawful to construct, erect, install, alter or locate any solar energy system (SES) within the city of West Des Moines, unless approved with: a. Building permit in the following zoning districts: open space and single-family residential zoned property. b. Site plan, major or minor modification to a site plan permit for all other zoning districts. ... ... c. The owner/operator of the SES must also obtain any other permits required by other federal, state and local agencies/departments prior to erecting the system.
Full Breakdown
Section 9-14-14.C.2 of the West Des Moines Zoning Code makes it unlawful to construct, erect, install, alter or locate a solar energy system anywhere in the City without City approval. The approval path depends on zoning: open space and single-family residential zoned property needs a building permit, while every other zoning district needs a site plan, or a major or minor site plan modification. The code carves out one exception to the site plan path: residential medium- or high-density districts do not need a new or modified site plan when the system goes on an owner-occupied dwelling that is detached or part of a horizontally attached multi-family building.
Beyond the permit itself, section 9-14-14.C.2.c requires the owner or operator to obtain any other permits required by federal, state or local agencies before erecting the system. The chapter layers on additional, permit-adjacent requirements: no more than one system per zoning lot unless the City Council specifically approves more, an engineer's certification and standard drawings with the application, compliance with the National Electrical Code, utility notification before an interconnected system generates electricity, and a rule that a system left nonfunctional for a continuous year is deemed abandoned and must be removed by the owner at their own expense.
Large solar energy systems rated over 15 kilowatts are barred outright in the Open Space district and on single-family property except as a building-integrated or building-mounted, grid-connected system, and utility-scale systems are not allowed anywhere in the City.
Violations & Fines
Installing, altering or locating a solar energy system in West Des Moines without the required building permit or site plan approval violates section 9-14-14.C.2, and the City can require the system be permitted after the fact or removed if it fails the chapter's siting and design rules. A system left nonfunctional for a continuous year is deemed abandoned and must be removed at the owner's expense, or the City may treat it as a public nuisance under Title 4, Chapter 4, on top of the general municipal infraction penalty of up to $750, or $1,000 for a repeat offense, under section 1-4-2.
Frequently Asked Questions
Do I need a permit to put solar panels on my West Des Moines home?
Can I install a large commercial-scale solar system on my property?
What happens if my solar system stops working?
Sources & Official References
Other rules in West Des Moines
Compare West Des Moines to another location·View the Iowa solar energy overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.