Swimming pool permit rules in Dearborn Heights, MI, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.

Key Facts

Permit required for
Any nonportable swimming pool, Sec. 30-3(a)
Plan approvals needed
Building & engineering dept. and health dept.
Final sign-off
Inspection before pool is used
Walkway requirement
3 ft wide, nonslip, around entire pool
Fine class
Class D: $250/$500/$1,000
Inspections
Health officer, any reasonable hour, Sec. 30-6

Summary

Sec. 30-3 bars building any nonportable swimming pool in Dearborn Heights until the building and engineering department issues a permit. The application must include detailed plans covering the recirculation, filtration and chlorination systems, and both that department and the health department must approve the plans before construction and sign off again before the pool is used.

(a)No nonportable swimming pool shall be hereafter erected unless and until a permit shall be issued from the building and engineering department before the commencement of any construction. All applications for permits shall be accompanied by a complete and detailed set of plans and specifications of the swimming pool, including recirculation, filtration and chlorination system details, and before any permit shall be issued, the plans and specifications must be approved by both the building and engineering department and the health department and before any swimming pool shall be put to use, a final inspection and approval must be had from the building and engineering department and the health department.(b)All applications for a permit for the construction of a nonportable swimming pool shall be accompanied by a fee as determined by resolution of the council to cover the cost of processing and inspection.

Full Breakdown

Sec. 30-3 of the Dearborn Heights City Code, in Chapter 30 (Swimming Pools), requires a permit from the building and engineering department before anyone builds a nonportable swimming pool, meaning any in-ground or other pool that is not a small, easily emptied portable unit under twelve inches deep as defined in Sec. 30-1. The permit application must come with a complete, detailed set of plans and specifications, including the recirculation, filtration and chlorination system, and the plans need sign-off from both the building and engineering department and the health department before the city will issue the permit. A separate final inspection and approval from both departments is required before the pool can be put to use, and the applicant pays a fee set by council resolution to cover processing and inspection.

Sec. 30-3 also sets baseline construction standards that a permitted pool must meet: it has to be built to withstand internal water pressure when full and outside earth pressure when empty if built below grade, the floor needs a nonslip surface, and the floor and walls must have an impervious finish. A walkway of impervious, nonslip material at least three feet wide, sloped away from the pool, must run entirely around it. Sec. 30-4 adds siting rules for the same permit process, placing pools in the rear yard at least four feet from side or rear lot lines and six feet from any house or building, and Sec. 30-6 gives the health officer and building and engineering inspectors the right to inspect a pool at any reasonable hour to confirm ongoing compliance.

Chapter 30 is a Class D chapter under Sec. 1-11, the highest fine tier in the schedule, reflecting the safety stakes of unpermitted pool construction.

Violations & Fines

Building a nonportable pool without the Sec. 30-3 permit, or without the required building and engineering and health department approvals, is a civil infraction. Chapter 30 is Class D under Sec. 1-11, carrying fines of $250 for a first offense, $500 for a second within a year, and $1,000 for a third or later repeat, on top of the cost of bringing the pool into compliance.

Frequently Asked Questions

Do I need a permit to install an in-ground pool in Dearborn Heights?
Yes. Sec. 30-3 requires a permit from the building and engineering department for any nonportable swimming pool before construction starts, with detailed plans covering the recirculation, filtration and chlorination systems.
Who has to approve my pool plans?
Both the building and engineering department and the health department must approve the plans before the city issues a permit, and both departments must also sign off on a final inspection before the pool can be used, under Sec. 30-3(a).
What construction standards does my pool have to meet?
Sec. 30-3 requires a nonslip pool floor, an impervious finish on the floor and walls, and a three-foot-wide nonslip walkway around the entire pool, plus the structural strength to withstand water pressure when full and earth pressure when empty if built below grade.
What's the fine for building a pool without a permit?
Swimming pools are a Class D chapter under Sec. 1-11, so an unpermitted pool draws a $250 fine for a first offense, $500 for a second within a year, and $1,000 for a third or later repeat.

Sources & Official References

Other rules in Dearborn Heights

All Dearborn Heights rules

Compare Dearborn Heights to another location·View the Michigan swimming pools & spas overview

Get notified when Pool Permits in Dearborn Heights, MI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Pool Permits in Nearby Cities

How other cities in Wayne County handle pool permits.

Livonia, MI
Some Restrictions
Dearborn, MI
Some Restrictions
Detroit, MI
Some Restrictions
Westland, MI
Some Restrictions