Swimming pool permit rules in Olympia, WA, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.

Key Facts

In-ground pool or spa permit fee
$145.99 for each
Above ground pool permit fee
$72.99 for each pool over 5000 gallons
Fencing trigger in the fee table
All pools over 24 inches in depth
Pool code adopted
International Swimming Pool and Spa Code, OMC § 16.04.020
Work without a permit
Investigation fee equal to the permit fee
Refund when no work is done
Up to 80 percent of the permit fee

Summary

In the City of Olympia, Washington, each in-ground swimming pool or spa carries a $145.99 plumbing permit fee, and each above ground pool over 5000 gallons carries $72.99. The fees sit in the building and plumbing permit schedule of Olympia Municipal Code § 4.36.010, which the building official administers.

C. Schedule of permit fees. On buildings, structures, gas, mechanical, and plumbing systems or alterations requiring a permit, an applicant shall pay the fee for each permit as required using the current fee schedule. ... Plumbing Permit Fees ... Swimming Pools* For each in-ground swimming pool or spa $145.99 For each above ground swimming pool over 5000 gallons $72.99

Full Breakdown

The fee table in Olympia Municipal Code § 4.36.010 lists swimming pools under the heading Plumbing Permit Fees. In the City of Olympia, Washington, each in-ground swimming pool or spa carries a permit fee of $145.99, and each above ground swimming pool over 5000 gallons carries $72.99. The schedule prints no separate pool line for an above ground pool of 5000 gallons or less. Subsection C requires an applicant to pay the fee for each permit using the current fee schedule, and subsection B says a permit is not valid until the fees prescribed by law have been paid. An amendment to a permit cannot be released until any additional fee is paid.

Plan review is a separate charge. Under subsection D, when submittal documents are required, the applicant pays the plan review fee at the time of submitting them, in addition to the permit fee, and the balance owing is paid at permit issuance. Incomplete or changed submittals trigger an additional plan review fee. The schedule prints additional plan review at $204.38 with a minimum charge of one-half hour, and reinspection is also $204.38. The schedule footnotes those hourly figures as the total hourly cost to the jurisdiction, whichever is greatest.

Pool installation standards come from OMC § 16.04.020, which adopts the current State adopted edition of the International Swimming Pool and Spa Code for regulating the installation of pools and spas, including the ANSI/APSP/ICC-7 Standards for Suction Entrapment Avoidance. The fee table footnote adds that all pools over 24 inches in depth require approved fencing, and that rule has its own page.

Fees can come back in part. Under subsection G, the building official can authorize a refund of up to 80 percent of the permit fee paid when no work has been done under the permit, and 100 percent of any fee erroneously paid or collected. The original permittee must apply in writing no later than 180 days after the date of fee payment.

Violations & Fines

Starting pool work without a permit triggers a special investigation under § 4.36.010(F). The property owner or other responsible party pays an investigation fee equal to the permit fee, in addition to the permit fee, and the code calls it an additional, punitive fee. A Stop Work order is charged at $204.38 per hour with a one-hour minimum. Work that stays illegal for 90 days after service of the Stop Work Order is considered hazardous and must be abated under the Olympia Municipal Code. Paying the investigation fee does not exempt anyone from other penalties prescribed by law.

Frequently Asked Questions

How much is a swimming pool permit in Olympia, WA?
In the City of Olympia, the fee table in OMC § 4.36.010 prints $145.99 for each in-ground swimming pool or spa and $72.99 for each above ground swimming pool over 5000 gallons. Those are the plumbing permit lines. The plan review fee is separate and is paid when submittal documents are filed with the City.
Is plan review charged separately from the pool permit fee?
Yes. Subsection D of § 4.36.010 calls the plan review fee a separate fee from the permit fees and in addition to them. You pay it when you submit documents for review, and the balance owing is paid when the permit is issued. Incomplete or changed plans cost an additional plan review fee at the scheduled rate.
What happens if I build a pool in the City of Olympia without a permit?
A special investigation is made before any permit issues. The owner pays an investigation fee equal to the permit fee on top of the permit fee, and the code calls it punitive. A Stop Work order is charged at $204.38 per hour with a one-hour minimum. Work left illegal 90 days after the Stop Work Order is served is considered hazardous.
Can I get a refund if the pool is never built?
The building official can authorize up to 80 percent of the permit fee paid when no work has been done under the permit. The original permittee must apply in writing no later than 180 days after paying. A fee erroneously paid or collected can be refunded at 100 percent under the same subsection.

Sources & Official References

Other rules in Olympia

All Olympia rules

Compare Olympia to another location·View the Washington swimming pools & spas overview

Get notified when Pool Permits in Olympia, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.