Skip to main content
CityRuleLookup

Santa Fe, NM Swimming Pools & Spas: Pool Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Swimming pool permit rules in Santa Fe, NM, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.

Key Facts

Permit fee
$50.00 per pool (Table 7-1.11-1)
Adopted code
2012 NM Swimming Pool, Spa, and Hot Tub Code
State authority
NMAC 14.8.3, Construction Industries Division
Residential permit expires
1 year from issuance (§7-1.6)
Commercial permit expires
2 years from issuance (§7-1.6)
Issuing office
Planning and Land Use Department

Summary

Building or installing a swimming pool in Santa Fe requires a permit under Chapter VII of the city code: Section 7-1.1(A)(11) SFCC 1987 adopts the 2012 New Mexico Swimming Pool, Spa, and Hot Tub Code, and the city's own fee table charges $50.00 per permit for each pool before construction can be inspected and approved.

(11)2012 New Mexico Swimming Pool, Spa, and Hot Tub Code adopted by the state of New Mexico construction industries division (NMAC 14.8.3), as may be amended from time to time, which adopts and amends the Uniform Swimming Pool, Spa, and Hot Tub Code (USPSHTC); and... Fees for permits and other matters associated with Chapter 7 SFCC 1987 are established in Table 7-1.11-1 below.

Each Swimming Pool $50.00 Permit

Full Breakdown

Santa Fe treats an in-ground or above-ground residential pool as a plumbing and building-permit item governed by Chapter VII, Building and Housing, of the Santa Fe City Code (SFCC 1987). Section 7-1.1(A)(11) adopts by reference the 2012 New Mexico Swimming Pool, Spa, and Hot Tub Code, administered under NMAC 14.8.3, which adopts and amends the Uniform Swimming Pool, Spa, and Hot Tub Code. That state code becomes part of the city's own building-code chapter, so no pool, spa, or hot tub can be installed within the city's planning and platting jurisdiction without the permit required by Section 7-1.5.

The city's fee schedule, Table 7-1.11-1 under Section 7-1.11, lists a $50.00 charge for "Each Swimming Pool" permit within the plumbing permit fee section, on top of the $50.00 issuance fee charged for every commercial or residential plumbing/gas permit and the $40.00 administrative fee applied to building permits generally. Section 7-1.3 requires the schedule to be posted at the Planning and Land Use Department and paid in full before the permit issues. Once granted, a residential pool permit expires one year from issuance and a commercial pool permit expires two years, under Section 7-1.6, unless the governing body suspends that clock by resolution during a broad economic downturn.

Outdoor pools are separately required to be covered when not in use under the city's water-conservation rules, but the permit itself is issued and enforced through Chapter VII's building-code process, with violations referred under Section 7-1.1(B) to Sections 1-3 and 14-11 SFCC 1987.

Violations & Fines

Section 7-1.1(B) SFCC 1987 states that anyone "violating or failing, neglecting, or refusing to comply with the provisions of the codes set forth in paragraph A. above or the other requirements of this chapter shall be subject to the enforcement provisions set forth in Sections 1-3 and 14-11 SFCC 1987." An uninspected or unpermitted pool is cited through that same general building-code enforcement track, not a pool-specific penalty.

Frequently Asked Questions

Do I need a permit to build a pool in Santa Fe?
Yes. Section 7-1.1(A)(11) SFCC 1987 adopts the 2012 New Mexico Swimming Pool, Spa, and Hot Tub Code into the city's building-code chapter, and Table 7-1.11-1 charges $50.00 per permit for each pool before construction, plumbing, or electrical work on it can be inspected and approved.
How much is a Santa Fe pool permit?
The plumbing permit fee schedule in Table 7-1.11-1, adopted under Section 7-1.11, sets a flat $50.00 charge for "Each Swimming Pool," in addition to the standard $40.00 administrative fee that applies to building permits generally under the same fee table.
How long does a Santa Fe pool permit last?
Under Section 7-1.6, a residential pool permit expires one year after it is issued and a commercial pool permit expires after two years, the same expiration clock that applies to any other residential or commercial building permit issued under Chapter VII.

Sources & Official References

Other rules in Santa Fe

All Santa Fe rules

Compare Santa Fe to another location·View the New Mexico swimming pools & spas overview

Get notified when Pool Permits in Santa Fe, NM changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.