Josephine County, OR Trash & Recycling: Recycling Rules (2026)
Key Facts
- Required license
- County solid waste/recycling franchise license
- Storage setback
- 30 ft minimum from property lines
- Review path
- Planning Commission + full site plan review
- Recycling center duty
- Confine materials on site, control littering
- Permit
- Development permit required (Ch. 19.41)
Summary
Rural Josephine County treats recycling centers and resource recovery facilities as a regulated land use under Josephine County Code § 19.86.030. Operators must hold a County solid waste or recycling franchise license, keep storage and building setbacks at least 30 feet from property lines, and confine all collected and processed materials to the site.
1. The owner and/or operator shall obtain and maintain a solid waste or recycling franchise license from Josephine County, or operate as an authorized subcontractor under some other franchised solid waste or recycling operator, and be so licensed or authorized during the entire time the use is conducted; ... ... 3. Areas used for the storage of waste and/or recycling materials and buildings used to house these materials shall be set back a minimum of 30 feet from all property lines. The setback area may be increased if additional separation is needed to mitigate significant adverse impacts; ... ... C. Recycling Centers and Resource Recovery Centers. Recycling centers and resource recovery facilities shall provide adequately designed and sized containers to collect and store recyclables. All collected, processed and stored materials shall be confined to the site. Littering shall be controlled on the property and along the perimeter of the property.
Full Breakdown
86 of the Rural Land Development Code covers the siting of solid waste operations, waste transfer centers, sewage transfer sites, resource recovery facilities and recycling centers together. 41; the chapter's review steps are the mandatory minimum and override any lesser procedure elsewhere in the title. 030(A), the operator must obtain and keep a County solid waste or recycling franchise license, or operate as an authorized subcontractor of a franchised operator, for as long as the use runs, and must obtain and keep every required federal, state and County permit; losing any of those permits is itself a violation of the development permit.
Storage and building areas for waste or recycling materials must sit back at least 30 feet from every property line, with a larger setback if needed to mitigate impacts, and the use cannot produce vibration, gas, dust, soot, smoke, steam, liquid or odor detectable from adjacent land. Near residential zoning, the operator must, where feasible, route delivery and pickup traffic and machinery maneuvering away from residential streets. Outdoor storage and processing must be screened by fencing, berms or vegetation. 030(C), must supply adequately sized containers to collect and store recyclables, keep all collected and processed material on site, and control littering on the property and along its perimeter.
Violations & Fines
Losing or failing to obtain a required federal, state or County permit is itself declared a violation under § 19.86.030(A)(2), subject to all enforcement remedies authorized by the title. On top of that, Title 19's general penalty at JCC § 19.19.010 makes any violation punishable, on conviction, by a fine up to $500 for a noncontinuing offense or up to $1,000 for a continuing one, after the Planning Director's required written-notice and correction period.
Frequently Asked Questions
Does a recycling operation need a license in Josephine County?
How far must a recycling facility sit from neighboring property?
What review does a new recycling center have to go through?
Sources & Official References
Other rules in Josephine County
Compare Josephine County to another location·View the Oregon trash & recycling overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.