Key Facts
- Standard street strip
- 10-foot width, 1 tree per 30 lineal feet
- Accessway strip
- 5-foot width, 1 tree per 20 lineal feet
- Minimum caliper
- 3 inches (2½ inches on small lots)
- Small lot threshold
- Under 7,500 square feet
- Species limit
- Medium/large canopy only; no pine
- Landscaping deadline
- 6 months after certificate of occupancy
Summary
New residential subdivisions in Marietta must plant street trees along road frontage as part of the required 10-foot landscape strip, using only medium or large canopy species at a minimum 3-inch caliper, with trees kept inside the front or major side setback so they count.
b)Street trees for individual lots within residential subdivisions shall be required based on total lineal road frontage as described above. Trees must be planted as close to the 10-foot landscape strip/border as possible but in no case shall trees located outside the front setback (or major side setback in case of comer lots) to be counted as street trees. Parcels used for purposes other than residential lots (common areas, detention areas, community clubhouses, etc.) shall follow the regulations for planted border areas. Trees must be medium or large canopy only and a minimum of 3-inch caliper.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 56).
Full Breakdown
08(G)(2)(b) requires street trees for individual lots within residential subdivisions based on total lineal road frontage, tied to the planted border standards in Table G-1: a 10-foot minimum landscape strip width along public and private streets with at least one tree per 30 lineal feet, or a 5-foot strip with one tree per 20 lineal feet along improved accessways. Trees must be planted as close to that 10-foot strip as possible, and a tree planted outside the required front setback, or the major side setback on a corner lot, cannot be counted toward the street tree requirement.
Parcels used for something other than a residential lot, such as common areas, detention areas or a clubhouse, follow the general planted border rules instead. Only medium or large canopy trees with at least a 3-inch caliper qualify, and pine species are excluded from street plantings entirely. 08(G)(2)(c): one street tree per road frontage, planted no more than 2 feet from the right-of-way or 5 feet from the back of curb, using a species from the Small Lot Tree Species Selection List at a minimum 2½-inch caliper. 08(J)(4).
Violations & Fines
Failing to complete the required street tree planting within 6 months of the certificate of occupancy is a violation of § 712.08(J)(4), enforced by the Department of Development Services. A site that installs trees outside the required setback so they don't actually satisfy the frontage count, or that substitutes an unlisted or pine species without written staff approval, is out of compliance with the approved landscape plan and subject to the same 10-day correction notice as other tree protection violations under § 712.08(O).
Frequently Asked Questions
Do I have to plant street trees for a new subdivision lot in Marietta?
Can I plant a pine tree as my required street tree?
What's different for a small-lot or townhouse subdivision?
How long do I have to finish planting after getting my certificate of occupancy?
Sources & Official References
Other rules in Marietta
Compare Marietta to another location·View the Georgia tree protection overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.