Mount Pleasant, SC Tree Protection: Parkway Planting (2026)
Key Facts
- Governing section
- § 155.048(21) Street trees
- Minimum ROW width for trees
- 60 feet
- Min. distance to tree centerline
- 5 feet from pavement/curb/sidewalk
- Root protection
- Approved root-barrier treatment required
- Applies to
- Construction of new streets only
- Reviewing agencies
- Planning and Engineering/Development Services
- Penalty for violations
- Misdemeanor under § 155.999
Summary
In the Town of Mount Pleasant, street trees planted within the public right-of-way of new streets must follow Town Council's design standards under Code § 155.048(21), including a 60-foot minimum right-of-way width and a 5-foot buffer from pavement.
(21) Street trees. The planting of street trees can provide innumerable benefits relative to the visual quality and health of the built environment, but may also result in damage to expensive public infrastructure as they mature. Therefore, a balanced approach to their installation is required to secure their benefits and to limit their detrimental effects. In light of these factors, street trees may be planted within the public street right-of-way in accordance with the following design standards. (Note that these provisions apply to the construction of new streets.) (a) Minimum right-of-way width in which street trees are planted shall be 60 feet. (b) Minimum horizontal distance between edge of pavement, back of curb or sidewalk, and the centerline of the planted tree shall be five feet; the effect of which is to create a suitable “verge” or planting strip for the trees. (c) An approved root-barrier treatment shall be included in the street tree planting to protect the roadway and/or sidewalk from future root damage.
Full Breakdown
048(21), street trees may be planted within the public street right-of-way only in accordance with design standards Town Council adopted to balance the benefits of street trees against the risk of damage to public infrastructure as trees mature. The rule applies to the construction of new streets reviewed by the Planning, Land Use and Neighborhoods Department and the Engineering and Development Services Department during subdivision plat approval. Street trees can be planted only where the right-of-way is at least 60 feet wide, which keeps enough room for the roadway, sidewalk and utilities alongside the trees.
The centerline of each planted tree must sit at least five feet horizontally from the edge of pavement, back of curb, or sidewalk, creating the 'verge' or planting strip the ordinance describes as necessary to protect the trees and the adjacent infrastructure. Developers must also include an approved root-barrier treatment with the street tree planting to keep roots from damaging the roadway or sidewalk later; this treatment can be applied at spot locations if construction plans are detailed enough, or along an entire street segment, and must be shown on the approved construction plans submitted for the new street.
A related provision in the same section requires utility easement locations to be coordinated by the project's civil engineer so they do not conflict with the tree-planting standards. Because these standards sit inside the subdivision improvement chapter, they are enforced at the plat-approval and construction-plan stage rather than through after-the-fact citations to homeowners; a developer who plants street trees without meeting the 60-foot right-of-way or 5-foot buffer requirement risks having construction plans rejected or held up during the town's review process.
Violations & Fines
Compliance is enforced through the town's plat and construction-plan review rather than field citations against individual trees. The Planning, Land Use and Neighborhoods Department and Engineering and Development Services review construction plans for new streets, and a developer whose plan omits the required 60-foot right-of-way, 5-foot pavement buffer, or root-barrier treatment can have plan approval withheld. Because Chapter 155 carries no separate penalty clause for this subsection, any violation of the subdivision regulations falls under Code § 155.999, which makes violations of the plat/subdivision regulations a misdemeanor under state law and lets the Town, through its attorney, enjoin an improper transfer or sale of the affected property.
Frequently Asked Questions
Can street trees be planted in any new right-of-way in Mount Pleasant?
How far must a street tree be from the curb or sidewalk?
Does the town require anything to protect sidewalks from tree roots?
Sources & Official References
Other rules in Mount Pleasant
Compare Mount Pleasant to another location·View the South Carolina tree protection overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Parkway Planting in Nearby Cities
How other cities in Charleston County handle parkway planting.