Skip to main content
CityRuleLookup

North Port, FL Tree Protection: Parkway Planting (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Spacing
1 tree per 50-100 linear feet
Timing
Before construction completion certification
Species
Must be on Table 4.3.4.4 list
Tolerance
Drought-tolerant, medium-high wind tolerance

Summary

North Port requires developers to plant street trees along development frontages and private rights-of-way at a set spacing, using only species approved on the city's street tree list.

Street trees shall be provided along the development site's street frontage and along private rights-of-way at intervals of not more than one (1) tree per fifty (50) linear feet nor less than one (1) tree one hundred (100) linear feet, except where a tree planting will jeopardize the proper functioning of public utilities or would be placed too close to existing natural trees.B.Installation Timing. Street trees shall be planted prior to the issuance of a construction completion certification.C.Species. Only tree species indicated as an appropriate street tree in Table 4.3.4.4. may be utilized as a street tree unless an alternative species is approved by the ULDC Administrator. Street trees must be drought-tolerant and have a medium to high wind tolerance. [Added 8-6-2024 by Ord. No. 2024-13, § 3.04(Exh. A)]

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of the City: Supplement 65 | Unified Land Development Code: Supplement 22).

Full Breakdown

North Port's Unified Land Development Code requires street trees along a development site's street frontage and along private rights-of-way, spaced at intervals of one tree per 50 to 100 linear feet. Fewer trees are allowed where planting would jeopardize public utilities or crowd existing natural trees. Trees must go in before the city issues a construction completion certification, and only species listed as approved street trees in Table 4.3.4.4 of the code qualify, unless the ULDC Administrator approves an alternative: all required street trees must be drought-tolerant with medium to high wind tolerance.

Violations & Fines

Failing to install required street trees before construction completion, or using species outside Table 4.3.4.4, can delay or block the city's completion certification.

Frequently Asked Questions

How far apart must street trees be planted in North Port?
The ULDC requires no more than one tree per 50 linear feet and no less than one tree per 100 linear feet of frontage, unless utility conflicts or existing trees justify an exception.
What tree species qualify as street trees?
Only species listed as approved street trees in ULDC Table 4.3.4.4 qualify, unless the ULDC Administrator approves an alternative; all must be drought-tolerant with medium to high wind tolerance.

Sources & Official References

Other rules in North Port

All North Port rules

Florida rules heatmap·Compare North Port to another location·View the Florida tree protection overview

Get notified when Parkway Planting in North Port, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Parkway Planting in Nearby Cities

How other cities in Sarasota County handle parkway planting.

Sarasota, FL
Some Restrictions