Skip to main content
CityRuleLookup

Oyster Bay, NY Tree Protection: Parkway Planting (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Street trees required
1 per 35 ft of frontage
Street tree minimum size
4 inches DBH at planting
Shade trees required
1 per 5,000 sq ft lot area
Shade tree minimum size
3 inches DBH at planting
Applies to
New/rebuilt 1- and 2-family homes
Waiver available
If existing healthy trees suffice

Summary

New or rebuilt one- and two-family homes in Oyster Bay must plant one street tree for every 35 feet of lot frontage and one shade tree for every 5,000 square feet of lot area before the certificate of occupancy issues, each from an approved species list.

Street trees. As a condition pursuant to the issuance of a building permit for the construction or reconstruction of any one- or two-family dwelling, but not including additions or renovations to an existing dwelling, the applicant shall agree to plant, prior to the issuance of the certificate of occupancy, at least one street tree for each 35 feet, or major portion thereof (50% or more), of street frontage of the lot for which the building permit is sought. Each such tree shall have a diameter at breast height (DBH) of not less than four inches at the time of planting and shall be of a species as listed in § 225-6D of the Trees Ordinance, Chapter 225 of the Code of the Town of Oyster Bay, Nassau County, New York.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4036544; v24 updated 2023-03-07; through 03-07-2023).

Full Breakdown

L. No. 8-2009) makes street tree planting a condition of the building permit for constructing or reconstructing a one- or two-family dwelling, though not for additions or renovations to an existing home. 1, before a certificate of occupancy issues the applicant must plant at least one street tree for every 35 feet, or major portion of 50% or more, of the lot's street frontage, each tree at least four inches in diameter (DBH) at planting and drawn from the species list in § 225-6D of the Trees Ordinance.

The Superintendent of the Highway Division in the Department of Public Works approves the location and species of each street tree. 2 adds a shade tree requirement on top of that: one new shade tree of at least three inches DBH for every 5,000 square feet, or major portion, of lot area, drawn from the § 225-6D or E species lists and sited to the approval of the Commissioner of the Department of Parks. 3 lets the Department of Planning and Development waive both requirements where existing healthy street or shade trees on the lot already meet or exceed the standard, provided the applicant properly prunes and protects those trees during construction so they remain healthy and undamaged by the time occupancy is certified.

Violations & Fines

Because planting is a condition of the building permit, the certificate of occupancy for a new or reconstructed one- or two-family home will not issue under § 246-4.12.1 and § 246-4.12.2 until the required street and shade trees are in the ground, sized correctly, and approved as to location and species, or until the Department of Planning and Development grants the § 246-4.12.3 waiver for existing trees that already meet the standard.

Frequently Asked Questions

Do I have to plant street trees when I build a new house in Oyster Bay?
Yes, if it's a new or reconstructed one- or two-family dwelling. Section 246-4.12.1 requires at least one street tree, four inches in diameter at planting, for every 35 feet of street frontage, planted before the certificate of occupancy is issued and approved as to species and location by the Highway Division.
Are shade trees required in addition to street trees in Oyster Bay?
Yes. Section 246-4.12.2 requires at least one new shade tree, three inches in diameter at planting, for every 5,000 square feet of lot area, on top of the street tree requirement, with species and siting approved by the Commissioner of the Department of Parks before occupancy is certified.
Can I skip planting new trees if my lot already has mature trees?
Possibly. Section 246-4.12.3 lets the Department of Planning and Development waive the planting requirements where existing healthy street or shade trees already meet or exceed the standard, but the builder must properly prune and protect those trees during construction so they stay healthy through occupancy.

Sources & Official References

Other rules in Oyster Bay

All Oyster Bay rules

New York rules heatmap·Compare Oyster Bay to another location·View the New York tree protection overview

Get notified when Parkway Planting in Oyster Bay, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.