Key Facts

Applies to
Conveyor car washes permitted after January 1, 2011
Minimum recycled
At least 50% of wash/rinse water
Exempt
Self-service and in-bay automatic car washes
Adopted
Ordinance No. 2013-05-05, May 7, 2013
Citation
City Code Sec. 105-23

Summary

New conveyor car washes built in Sandy Springs after January 1, 2011 must install a recycled water system that reclaims at least 50 percent of the water used in wash and rinse cycles. The rule applies only to conveyor-tunnel facilities permitted after that date; self-service wash bays and in-bay automatic car washes are exempt under City Code Sec. 105-23.

(a)Purpose and intent. The purpose of this section is to reduce water consumption from commercial car wash facilities by requiring all new conveyor car washes to install operational recycled water systems. ... (c)Commercial car wash water recycling requirement. All new commercial conveyor car washes permitted and constructed after January 1, 2011, shall be required to install operational recycled water systems. A minimum of 50 percent of water utilized shall be recycled.(d)Applicability.(1)This section applies to all new conveyor car washes permitted and constructed after January 1, 2011, regardless of the water source.(2)The provisions of this section do not apply to conveyor commercial car washes that were permitted or constructed before January 1, 2011.(3)The provisions of this section do not apply to self-service car washes or in-bay car washes.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 24 | Development Code: Supplement 2 | Technical Manuals: Supplement 4).

Full Breakdown

City Code Sec. 105-23, adopted by Ordinance No. 2013-05-05 on May 7, 2013, targets water consumption at commercial car wash facilities. It applies specifically to conveyor car washes, defined in the ordinance as facilities where a vehicle moves through a tunnel on a conveyor belt while the driver may remain inside or wait outside. Any conveyor car wash permitted and constructed after January 1, 2011 must install an operational recycled water system, defined as a system that captures and reuses water previously used in wash or rinse cycles, and that system must recycle a minimum of 50 percent of the water the facility uses.

The requirement attaches at the point of construction: it reaches every new conveyor wash built after the 2011 date regardless of what water source supplies it. The ordinance carves out three categories that fall outside its reach. Conveyor car washes permitted or built before January 1, 2011 are grandfathered and never have to retrofit a recycling system. Self-service car washes, where customers wash their own vehicles with spray wands and brushes, are excluded entirely. In-bay automatic car washes, where the vehicle stays parked in a single bay while a machine passes back and forth over it, are also excluded.

The section sits in Chapter 105, Article I of the City Code, in the same division that regulates other utility-related building requirements, including a separate provision requiring residential buildings to submeter water use by unit.

Violations & Fines

Section 105-21 makes it a Code violation for any person, firm, corporation, or agent to fail to comply with a requirement of the construction codes, the division under which Section 105-23 falls. The building official will not issue a permit, and cannot issue a certificate of occupancy, for a new conveyor car wash whose plans and installation fail to include the required recycled water system, since Section 105-46 conditions permits on conformity with the Code.

Frequently Asked Questions

Does every car wash in Sandy Springs need a recycled water system?
No. The requirement in Section 105-23 only reaches conveyor car washes, the tunnel-style facilities where the vehicle moves on a belt, that were permitted and built after January 1, 2011. Self-service wash bays and in-bay automatic washes, where a single machine moves over a stationary car, are excluded outright, and conveyor washes built before 2011 are grandfathered.
How much water has to be recycled?
The recycled water system installed under Section 105-23 must reuse a minimum of 50 percent of the water the facility uses in its wash and rinse cycles. The ordinance defines the system as equipment that captures water already used in those cycles and puts it back into service rather than sending it to the sewer.
What happens if a new conveyor wash skips the recycling system?
The building official reviews car wash construction plans against the full Code before issuing a permit under Section 105-46, so a design missing the required recycled water system can be refused a permit. Operating without a required permit, or building in violation of an approved permit, is a Code violation under Section 105-21.

Sources & Official References

Other rules in Sandy Springs

All Sandy Springs rules

Compare Sandy Springs to another location·View the Georgia water use rules overview

Get notified when Recycled Water Rules in Sandy Springs, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Recycled Water Rules in Nearby Cities

How other cities in Fulton County handle recycled water rules.

Atlanta, GA
Some Restrictions
Roswell, GA
Some Restrictions