Amarillo, TX Zoning Overlays & Bonuses: Downtown Design Guide (2026)
Key Facts
- Trigger
- New construction or exterior alteration in the District
- Reviewer
- Planning Director (minor) or Design Review Board (major)
- Major modification threshold
- Over 50% of building value and $50,000 cost
- Certificate validity
- Expires one year after approval
- Appeal window
- 10 days to Design Review Board
- Penalty
- $1 to $2,000 fine per day, Sec. 4-10-4
Summary
Any new construction or exterior remodel inside Amarillo's Downtown Urban Design District needs a certificate of appropriateness before the Building Safety Department will issue a permit. City Code Sec. 4-10-121 adopts the Downtown Urban Design Standards, and Sec. 4-10-122 blocks permits for new buildings, additions, or exterior changes until the Planning Department or Downtown Design Review Board signs off on compliance.
Development in the District is subject to the development standards contained in the "Downtown Urban Design Standards" (hereafter in this Division, "Standards") as stated in the Exhibit attached to this Division. The Downtown Urban Design Standards are hereby approved and adopted. Such Standards shall be appended to the zoning ordinance, Chapter 4-10 of the Municipal Code of Ordinances as Appendix XXI (B). In the event there is a difference between the Standards and this Division that cannot be harmonized, then the provisions in the Standards shall prevail. ... no building permit shall be issued for new construction, expansion, renovation, remodeling or other alterations to the exterior of any building (other than painting), parking lot, or public right-of-way or common area open to the public within the District, until a certificate of appropriateness reflecting compliance with the Standards is approved by either the Downtown Design Review Board or the Planning Department as provided in this Article.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 81).
Full Breakdown
The Downtown Urban Design District covers the historic core bounded roughly by Washington Street, SW 11th Avenue, Adams Street, the BNSF rail corridor, and Interstate 40, layered as a zoning overlay on top of each property's base zoning (Sec. 4-10-120). Inside that boundary, Sec. 4-10-121 adopts the Downtown Urban Design Standards as Appendix XXI(B) to the zoning ordinance, and where the Standards conflict with the Division's text, the Standards control. Sec. 4-10-122 makes a certificate of appropriateness a prerequisite for any building permit covering new construction, an addition, or an exterior alteration other than painting, including work on parking lots or public right-of-way areas open to the public.
Two review tracks exist. The Planning Director or a designee can approve signage, landscaping, sidewalk work, minor exterior modifications, temporary construction facilities, and in-kind restoration of historic buildings. Everything else, including all new construction and any major modification (exceeding fifty percent of the building's tax-roll value with a project cost of $50,000 or more), goes to the Downtown Design Review Board. Applicants must attend a pre-design conference and submit a site plan, landscape plan, and building elevations under Secs. 4-10-123 and 4-10-124, and neither reviewer may reject a project for missing a preference rather than a required Standard (Sec.
4-10-125). A certificate expires one year after approval. Denials by the Planning Director may be appealed to the Design Review Board within ten days (Sec. 4-10-126(a)); Board decisions go next to the Zoning Board of Adjustment, and from there an aggrieved owner may sue in district court.
Violations & Fines
Proceeding without an approved certificate of appropriateness blocks issuance of the building permit itself, so work cannot legally start. Because the Standards are appended to Chapter 4-10, a violation carries the zoning chapter's general penalty under Sec. 4-10-4: a fine of not less than $1.00 nor more than $2,000.00 upon conviction, with each day of noncompliance charged as a separate offense, plus a civil suit right for any affected property owner.
Frequently Asked Questions
Do I need a certificate of appropriateness just to repaint a downtown building?
Who approves my downtown remodel, staff or a board?
How long does an approved certificate of appropriateness last?
What happens if the Planning Director denies my application?
Sources & Official References
Other rules in Amarillo
Texas rules heatmap·Compare Amarillo to another location·View the Texas zoning overlays & bonuses overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.