Pomona, CA Accessory Structures: ADU Impact Fees (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Fee-exempt size
749 sq ft or smaller
Fee basis above 749 sq ft
Prorated to primary dwelling area
Excludes
Water/sewer connection or capacity charge
New utility connection
Required with new single-family home
Connection fee exemption
Interior ADU conversions
City fee cap
Reasonable cost of service only

Summary

Pomona charges no impact fee on an ADU of 749 square feet or smaller. Larger ADUs pay a fee prorated to the primary dwelling's floor area, and utility connection fees follow a separate three-tier rule depending on how the unit was created.

a. Impact Fees

1. No impact fee is required for an ADU that is less than or equal to 749 square feet in area.

2. Any impact fee that is required for an ADU that is 750 square feet or larger in area must be charged proportionately in relation to the square footage of the primary dwelling unit. (E.g., the floor area of the primary dwelling, divided by the floor area of the ADU, times the typical fee amount charged for a new dwelling.) "Impact fee" here does not include any connection fee or capacity charge for water or sewer service.

Full Breakdown

Sec. a of Pomona's Zoning and Development Code sets impact fees for accessory dwelling units. No impact fee is required for an ADU that is less than or equal to 749 square feet in area. Any impact fee required for an ADU of 750 square feet or larger must be charged proportionately in relation to the square footage of the primary dwelling unit, calculated as the floor area of the primary dwelling divided by the floor area of the ADU, times the typical fee amount charged for a new dwelling.

The code specifies that 'impact fee' in this section does not include any connection fee or capacity charge for water or sewer service, which are addressed separately under Sec. b. Utility Fees and Connections. If an ADU is built alongside a new single-family home, a separate utility connection and the normal connection fee and capacity charge for a new dwelling are required. Converted ADUs on a single-family lot created as an Interior ADU under Sec. 1 are not required to have a new or separate utility connection, and no connection fee or capacity charge applies to them.

All other ADUs not covered by that exception require a new, separate utility connection, subject to a connection fee or capacity charge proportionate to the burden the ADU creates, measured by floor area or by drainage-fixture units under the Uniform Plumbing Code, and the City-charged portion of that fee cannot exceed the reasonable cost of providing the service.

Violations & Fines

The code does not set a separate penalty schedule for impact-fee noncompliance within Sec. 830.A.7; fee obligations attach as a condition of permit issuance. An applicant who fails to pay a required impact or connection fee cannot obtain the building permit or certificate of occupancy for the ADU, since Sec. 830.A.6.k bars issuance of a certificate of occupancy for an ADU ahead of the primary dwelling and ties occupancy approval to compliance with the chapter's development standards.

Frequently Asked Questions

How big can my Pomona ADU be with no impact fee?
Up to 749 square feet. Sec. 830.A.7.a states no impact fee is required for an ADU that is less than or equal to 749 square feet in area, regardless of whether it is attached or detached.
How is the impact fee calculated for a larger Pomona ADU?
For ADUs of 750 square feet or more, the fee is charged proportionately to the primary dwelling's size: divide the primary dwelling's floor area by the ADU's floor area, then multiply by the typical new-dwelling fee amount, per Sec. 830.A.7.a.2.
Do I still owe a water or sewer connection fee if my ADU is impact-fee exempt?
Possibly. Sec. 830.A.7.a excludes water and sewer connection or capacity charges from its 'impact fee' definition. Those are governed separately by Sec. 830.A.7.b, which exempts only interior conversions on single-family lots from a new utility connection.
Which Pomona ADUs skip the new utility connection fee entirely?
Converted Interior ADUs on a single-family lot, created under Sec. 830.A.4.a.1, are not required to have a new or separate utility connection and owe no connection fee or capacity charge, per Sec. 830.A.7.b.2.

Sources & Official References

Other rules in Pomona

All Pomona rules

California rules heatmap·Compare Pomona to another location·View the California accessory structures overview

Get notified when ADU Impact Fees in Pomona, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

ADU Impact Fees in Nearby Cities

How other cities in Los Angeles County handle adu impact fees.

Downey, CA
Light Restrictions
Pasadena, CA
Light Restrictions
Compton, CA
Light Restrictions
Inglewood, CA
Light Restrictions
El Monte, CA
Some Restrictions
Norwalk, CA
Some Restrictions
Santa Clarita, CA
Some Restrictions
Glendale, CA
Some Restrictions