Skip to main content
CityRuleLookup

Walla Walla County, WA Accessory Structures: ADU Impact Fees (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

ADU planning fee
$744.00 (Code § 3.08.110)
Size cap
1,100 sq ft or 50% of primary home
Minimum primary home size
800 square feet
ADU limit
one per lot
Owner-occupancy
6 months/year, rent-free
Unpermitted work
doubled fee under § 15.04.031

Summary

Walla Walla County charges $744 in Community Development planning fees to add an accessory dwelling unit in the unincorporated area, on top of the regular building permit fee scale. There is no separate GMA impact fee for ADUs. County code caps the unit at 1,100 square feet or half the primary home's floor area, whichever is smaller, and requires the owner to live on-site rent-free at least six months a year.

These county ordinances apply to unincorporated areas of Walla Walla County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

TYPE FEE Accessory Dwelling Unit $744.00 ... Any person who commences work on a building, structure, site grading, plumbing, mechanical system, gas line, or other activity prior to obtaining a permit required by this code shall be subject to an investigation fee. The investigation fee shall be equal to the permit fee set forth in Chapter 3.08, resulting in a double fee. ... "Accessory dwelling unit" means a dwelling unit within a primary residence or an accessory building for occupancy by a person or family for living and sleeping purposes, or for the temporary use of guests of the occupants of the premises. "Accessory dwelling unit" includes "guesthouse." ... D.The accessory dwelling unit, excluding any garage area and other nonliving areas, shall not exceed one thousand one hundred square feet, or fifty percent of the total square footage of the primary residence (excluding any garage area and other nonliving space), whichever is less; ... J.Either the primary residence or the accessory dwelling unit must be occupied by an owner of the property for at least six (6) months out of a year, and at no time can the owner receive rent for the owner-occupied dwelling;

Full Breakdown

Section 3.08.110 of the Walla Walla County Code lists "Accessory Dwelling Unit" as its own $744.00 line on the Community Development Department's planning application fee schedule, a flat charge collected separately from the building permit valuation fee that applies once construction actually starts. The county has no GMA-style impact fee tied to school, park, or road capacity specifically for ADUs; the $744 planning fee, plus the standard building permit fee, is the entire county charge.

Section 17.08.015 defines an accessory dwelling unit as a unit within the primary residence or an accessory building for family members or guests, and treats "guesthouse" as the same thing. The primary residence must already be at least 800 square feet before an ADU can be added, and the ADU itself cannot exceed 1,100 square feet or 50 percent of the primary home's floor area, whichever is smaller. Only one ADU is allowed per lot, mobile homes and RVs cannot serve as the unit, and it must share at least four of six listed features with the main house, including road access, septic, water, utility meters, yard, or parking. Either the primary house or the ADU must be owner-occupied at least six months a year, and the owner cannot collect rent on the unit they occupy, though the ADU itself may be rented out. One extra off-street parking space is required beyond what the main house already needs. Starting construction before the county issues a permit doubles the fee under Section 15.04.031.

Violations & Fines

Building or converting an ADU without the Community Development permit exposes the owner to Section 15.04.031's doubled investigation fee, charged as a second full permit fee for work started before approval. Title 15 building code violations are misdemeanors that the building official can refer to the Walla Walla County prosecuting attorney after trying voluntary compliance. An ADU that exceeds the 1,100-square-foot cap, adds a second unit per lot, or violates the owner-occupancy rule will not receive permit approval until it is brought into compliance.

Frequently Asked Questions

Does Walla Walla County charge an ADU impact fee?
No. The county's only ADU-specific charge is the $744.00 planning application fee under Code § 3.08.110, plus the standard building permit fee once construction starts. There is no separate school, park, or road impact fee tied to accessory dwelling units in the unincorporated county.
How big can an ADU be in unincorporated Walla Walla County?
Section 17.08.015 caps it at 1,100 square feet or 50 percent of the primary residence's floor area, whichever is smaller, and the primary home must already be at least 800 square feet before an ADU is allowed. Only one ADU is permitted per lot.
Can I rent out both the main house and the ADU?
No. Section 17.08.015 requires either the primary residence or the ADU to be owner-occupied at least six months a year, and the owner cannot collect rent on the unit they personally occupy, though the ADU itself may be rented to a tenant.

Sources & Official References

Other rules in Walla Walla County

All Walla Walla County rules

Compare Walla Walla County to another location·View the Washington accessory structures overview

Get notified when ADU Impact Fees in Walla Walla County, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.