ADU rules in National City, CA, also called accessory dwelling unit regulations or granny flat ordinances, cover setbacks, owner-occupancy, parking, and permit requirements.

Key Facts

Units per lot
One ADU; two detached on a multi-family lot
Review deadline
60 days after a complete application
Setbacks
15 feet front; 4 feet side and rear
Height
Primary dwelling or 16 feet; 25 feet over a garage
Parking
No additional parking required
Size range
150 square feet minimum; detached 1,200 maximum

Summary

In National City, one accessory dwelling unit is allowed on any lot with a proposed or existing dwelling in a residential zone, and a lot with an existing multi-family building can add two detached units of up to 1,200 square feet and 16 feet in height each. Staff must act on the building permit within 60 days of a complete application.

D.ADUs permitted.1.One ADU is permitted on a lot if all the following are met:a.The lot includes a proposed or existing dwelling.b.The lot is in a zone that allows for a residential use as indicated in Table 18.20.020.c.The proposed ADU is located where the city manager or his/her designee has not determined that public utilities or services are inadequate or the ADU will adversely impact traffic flow or public safety.d.The ADU meets the standards of Subsection F.2.Two detached ADUs are permitted on a lot with a multi-family residential use if all the following are met:a.The lot includes an existing multi-family residential dwelling.b.Each ADU does not exceed a total floor area of one thousand two hundred square feet and sixteen feet in height. ... E.Review. ... The approval of an ADU is subject to a ministerial decision process outlined in Section 18.12.030. For the purposes of this subsection, a staff person designated by the city manager shall review and act on a building permit application for an ADU within sixty days after a complete application is received.

Full Breakdown

Section 18.30.380 of the Land Use Code (Title 18) governs accessory dwelling units in National City. A lot qualifies for one ADU when it holds a proposed or existing dwelling, sits in a zone that allows residential use under Table 18.20.020, meets the development standards in subsection F, and is not located where the city manager or designee has determined that public utilities or services are inadequate or that the ADU will hurt traffic flow or public safety. A lot with an existing multi-family building can instead hold two detached ADUs, each capped at 1,200 square feet of floor area and 16 feet in height. Multiple ADUs are also allowed inside the non-livable parts of existing multi-family structures, such as storage rooms, boiler rooms, passageways, attics, basements and garages, and up to 25 percent of the existing number of multi-family dwelling units is allowed.

Approval is ministerial under Section 18.12.030. A staff person designated by the city manager acts on the building permit application within 60 days after a complete application is received. An ADU submitted with a new primary dwelling cannot be approved before the primary dwelling is, and an applicant can request a variance under Section 18.12.120 in the same filing.

Subsection F sets the physical limits. No additional parking is required. On a single-family lot the ADU cannot exceed the height of the primary dwelling or 16 feet, whichever is greater, and the cap rises to 25 feet for an ADU built above a garage or on a lot smaller than 5,000 square feet. The front setback is 15 feet and the side and rear setbacks are 4 feet. The smallest ADU is 150 square feet. An attached unit is capped at 50 percent of the primary dwelling's floor area or 1,200 square feet, whichever is greater, and a detached unit at 1,200 square feet, with no cap for a unit built within an existing footprint. No minimum lot size and no passageway are required, fire sprinklers are required only when the primary residence needs them, and one 24-inch box tree goes in the front setback or the abutting parkway. ADUs must follow the single-family infill standards in Section 18.42.070.C.

Violations & Fines

Section 18.30.380 prints no fine schedule of its own. It does print the gate: the record owner must sign a City Attorney form agreement, recorded with the County Recorder, before a building permit issues for an ADU. A structure of a temporary nature cannot serve as a residence or ADU, and an ADU cannot be sold or conveyed apart from the primary residence.

Frequently Asked Questions

Does an ADU in National City need a public hearing?
No. Section 18.30.380(E) makes approval a ministerial decision under Section 18.12.030. A staff person designated by the city manager acts on the building permit application within 60 days after a complete application is received. An applicant can request a variance under Section 18.12.120 alongside the ADU application if a standard cannot be met.
How tall can an ADU over a garage be in National City?
On a lot with a single-family primary dwelling, an ADU built above a garage, or on a lot smaller than 5,000 square feet, can reach 25 feet. Other ADUs on single-family lots cannot exceed the primary dwelling's height or 16 feet, whichever is greater. A detached ADU on a multi-family lot is capped at 16 feet.
How many ADUs can a multi-family property have in National City?
Two detached ADUs are allowed on a lot with an existing multi-family dwelling, each up to 1,200 square feet and 16 feet in height. Separately, multiple ADUs are allowed inside non-livable parts of existing multi-family structures, and up to 25 percent of the existing number of multi-family units is allowed.
Must an ADU match the style of the main house in National City?
ADUs must conform to the single-family infill standards in Section 18.42.070.C, which call for compatible window and door detailing, materials, roof style and pitch, and matching exterior materials, details and colors on additions. Subsection F.6 also requires a 24-inch box tree in the 15-foot front setback or the abutting parkway.

Sources & Official References

Other rules in National City

All National City rules

How National City compares: Easiest Cities to Build an ADU·California rules heatmap·Compare National City to another location·View the California accessory structures overview

Get notified when ADU Rules in National City, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

ADU Rules in Nearby Cities

How other cities in San Diego County handle adu rules.

El Cajon, CA
Some Restrictions
Vista, CA
Some Restrictions
San Marcos, CA
Some Restrictions
Escondido, CA
Some Restrictions
Oceanside, CA
Some Restrictions
Carlsbad, CA
Some Restrictions
San Diego, CA
Some Restrictions
Bostonia, CA
Few Restrictions