Skip to main content
CityRuleLookup

Bellevue, NE Accessory Structures: Shed & Carport Rules (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Shed permit rules in Bellevue, NE, also referred to as storage shed, backyard shed, or accessory building regulations, set size limits, setbacks, and when a building permit is required.

Key Facts

Permit-exempt shed size
Footprint of 120 square feet or less
Governing section
§ 8-18.5(A)(1), amending UAC § 301.2.1(I)
Enforcing agency
Permits and Inspections Department
Plan review fee
25% of building permit fee (§ 8-18.5(A)(5))
Unpermitted work penalty
2x to 4x normal fee (§ 8-18.5(A)(6))
Permit expiration
180 days if work not started (§ 8-20)

Summary

In the City of Bellevue, Nebraska, a one-story detached accessory building used as a tool or storage shed, playhouse, or similar structure needs no building permit if its footprint is 120 square feet or less. The Permits and Inspections Department enforces the threshold under the city's amendment to the Uniform Administrative Code; anything larger triggers a full permit application, plan review, and inspection before construction starts.

(1) Amend Section 301.2.1(I) to provide as follows: One story detached accessory buildings used as tool and storage sheds, playhouses, and similar uses, provided the building footprint does not exceed one hundred twenty (120) square feet.

Full Breakdown

Bellevue amended Section 301.2.1(I) of the 1997 Uniform Administrative Code through Bellevue Code of Ordinances § 8-18.5(A)(1) to exempt small detached accessory buildings from the city's building permit requirement. A one-story tool shed, storage shed, playhouse, or similar structure can be built without a permit only if the building footprint does not exceed 120 square feet; anything bigger, including larger sheds, garages, or workshops, needs a permit application filed with the Permits and Inspections Department under § 8-19, which keeps a record of every application.

Permit fees follow the city's Master Fee Schedule referenced in Tables 3-A through 3-H (§ 8-18.5(A)(4)), and a plan review fee equal to 25 percent of the building permit fee applies when submittal documents are required (§ 8-18.5(A)(5)). Anyone who starts work on an oversized shed without first pulling a permit faces an investigation fee of twice the normal permit fee if they come forward voluntarily, or four times the normal fee if the Permits and Inspections Department issues a stop-work order first (§ 8-18.5(A)(6)).

Permits, once issued, expire if work is not started within 180 days or is abandoned for 180 days, per § 8-20, and a permittee may seek one extension before the fee resets. Disputes over the Building Official's application of the shed-size threshold go to the five-member Building Board of Review created under § 8-18.5(A)(10), which can sustain, reverse, or modify enforcement decisions after a public hearing.

Violations & Fines

Building without a permit for a shed over 120 square feet exposes the owner to the investigation fee under § 8-18.5(A)(6): double the normal permit fee if reported voluntarily, or four times the fee if the Permits and Inspections Department issues a stop-work order first. Beyond the fee, any violation of the Bellevue Code carries the general penalty under § 1-11: a fine of up to $500, up to six months in jail, or both, with each day of continued violation a separate offense.

Frequently Asked Questions

Do I need a permit for a small storage shed in Bellevue, Nebraska?
No. Under Bellevue Code of Ordinances § 8-18.5(A)(1), a one-story detached tool shed, storage shed, playhouse, or similar accessory building is exempt from the building permit requirement as long as its footprint does not exceed 120 square feet. A larger shed needs a permit filed with the Permits and Inspections Department before you build it.
What happens if I build an oversized shed without a permit?
The Permits and Inspections Department can charge an investigation fee under § 8-18.5(A)(6): double the normal permit fee if you come forward on your own, or four times the fee if the department issues a stop-work order first. The general Code penalty in § 1-11 also allows a fine up to $500 or six months in jail.
Who reviews shed permit disputes in Bellevue?
The five-member Building Board of Review, created under § 8-18.5(A)(10), hears appeals of the Building Official's decisions on construction matters, including accessory-building permit questions, after a public hearing, and can sustain, reverse, change, or modify the ruling.

Sources & Official References

Other rules in Bellevue

All Bellevue rules

How Bellevue compares: Shed Permit Requirements by City·Compare Bellevue to another location·View the Nebraska accessory structures overview

Get notified when Shed & Carport Rules in Bellevue, NE changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.