Bellevue, NE Accessory Structures: Shed & Carport Rules (2026)
Shed permit rules in Bellevue, NE, also referred to as storage shed, backyard shed, or accessory building regulations, set size limits, setbacks, and when a building permit is required.
Key Facts
- Permit-exempt shed size
- Footprint of 120 square feet or less
- Governing section
- § 8-18.5(A)(1), amending UAC § 301.2.1(I)
- Enforcing agency
- Permits and Inspections Department
- Plan review fee
- 25% of building permit fee (§ 8-18.5(A)(5))
- Unpermitted work penalty
- 2x to 4x normal fee (§ 8-18.5(A)(6))
- Permit expiration
- 180 days if work not started (§ 8-20)
Summary
In the City of Bellevue, Nebraska, a one-story detached accessory building used as a tool or storage shed, playhouse, or similar structure needs no building permit if its footprint is 120 square feet or less. The Permits and Inspections Department enforces the threshold under the city's amendment to the Uniform Administrative Code; anything larger triggers a full permit application, plan review, and inspection before construction starts.
(1) Amend Section 301.2.1(I) to provide as follows: One story detached accessory buildings used as tool and storage sheds, playhouses, and similar uses, provided the building footprint does not exceed one hundred twenty (120) square feet.
Full Breakdown
Bellevue amended Section 301.2.1(I) of the 1997 Uniform Administrative Code through Bellevue Code of Ordinances § 8-18.5(A)(1) to exempt small detached accessory buildings from the city's building permit requirement. A one-story tool shed, storage shed, playhouse, or similar structure can be built without a permit only if the building footprint does not exceed 120 square feet; anything bigger, including larger sheds, garages, or workshops, needs a permit application filed with the Permits and Inspections Department under § 8-19, which keeps a record of every application.
Permit fees follow the city's Master Fee Schedule referenced in Tables 3-A through 3-H (§ 8-18.5(A)(4)), and a plan review fee equal to 25 percent of the building permit fee applies when submittal documents are required (§ 8-18.5(A)(5)). Anyone who starts work on an oversized shed without first pulling a permit faces an investigation fee of twice the normal permit fee if they come forward voluntarily, or four times the normal fee if the Permits and Inspections Department issues a stop-work order first (§ 8-18.5(A)(6)).
Permits, once issued, expire if work is not started within 180 days or is abandoned for 180 days, per § 8-20, and a permittee may seek one extension before the fee resets. Disputes over the Building Official's application of the shed-size threshold go to the five-member Building Board of Review created under § 8-18.5(A)(10), which can sustain, reverse, or modify enforcement decisions after a public hearing.
Violations & Fines
Building without a permit for a shed over 120 square feet exposes the owner to the investigation fee under § 8-18.5(A)(6): double the normal permit fee if reported voluntarily, or four times the fee if the Permits and Inspections Department issues a stop-work order first. Beyond the fee, any violation of the Bellevue Code carries the general penalty under § 1-11: a fine of up to $500, up to six months in jail, or both, with each day of continued violation a separate offense.
Frequently Asked Questions
Do I need a permit for a small storage shed in Bellevue, Nebraska?
What happens if I build an oversized shed without a permit?
Who reviews shed permit disputes in Bellevue?
Sources & Official References
Other rules in Bellevue
How Bellevue compares: Shed Permit Requirements by City·Compare Bellevue to another location·View the Nebraska accessory structures overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.