Spring Hill, TN Accessory Structures: Shed & Carport Rules (2026)
Shed permit rules in Spring Hill, TN, also referred to as storage shed, backyard shed, or accessory building regulations, set size limits, setbacks, and when a building permit is required.
Key Facts
- Permit-exempt shed floor area
- Not more than 32 square feet
- Structure type
- Portable, one-story, detached accessory structure
- Covered uses
- Tool and storage sheds, playhouses and similar uses
- Permit expiration
- 180 days after issuance
- Extension
- Up to 180 days, on written request
- Governing section
- § 12-402(B)(1), amending IRC R105.2
Summary
In the City of Spring Hill, Tennessee, only a portable one-story detached accessory structure used as a tool or storage shed, playhouse or similar use is exempt from a building permit, and only if its floor area does not exceed 32 square feet. The exemption comes from the city's amendment to Residential Code Section R105.2.
Section R105.2 on building work exempted from the permit requirement is amending exemptions 1, 2, 9 and 10 and adding 11 substituting in lieu thereof the following: 1. Portable one-story detached accessory structures used as tool and storage sheds, playhouses and similar uses, provided the floor area does not exceed 32 square feet.
Full Breakdown
Section 12-401 adopts the International Residential Code for One- and Two-Family Dwellings, 2018 edition, and § 12-402 then amends it for the City of Spring Hill, Tennessee. Subsection 12-402(B)(1) rewrites the Section R105.2 list of building work exempt from the permit requirement. Exemption 1 reads: portable one-story detached accessory structures used as tool and storage sheds, playhouses and similar uses, provided the floor area does not exceed 32 square feet. Three conditions sit in that sentence: the structure is portable, it is one story, and the floor area does not exceed 32 square feet.
A shed that fails any of them is outside the exemption printed in the code. Chapter 4 of Title 12 prints no setback distance, height limit or lot-coverage cap for sheds, and Title 14 of the code is only a short pointer to zoning, so those numbers are not in the code text the city publishes here. A shed that needs a permit follows the rest of § 12-402. Section 12-402(C) makes a building permit expire 180 days after issuance unless voided earlier for suspension, abandonment or failure to commence the work, and the Building Official can extend that by up to 180 days on a written request showing circumstances beyond the applicant's reasonable control. Under § 12-801, the permit fee pays for the first inspection of each construction phase, and extra re-inspections cost money.
Violations & Fines
Section 12-404 makes it unlawful for any person to violate or fail to comply with any provision of the Residential Code as adopted and modified, which includes building a shed that needs a permit without one. The chapter prints no separate fine. Re-inspections cost $25 for the second and $50 for each third or later one per permit, and the city issues no certificate of occupancy until they are paid.
Frequently Asked Questions
How big can a shed be in Spring Hill without a permit?
Does a playhouse count under the shed exemption?
Where are Spring Hill shed setbacks written?
How long does a shed building permit last in Spring Hill?
Sources & Official References
Other rules in Spring Hill
How Spring Hill compares: Shed Permit Requirements by City·Compare Spring Hill to another location·View the Tennessee accessory structures overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.