Westland, MI Accessory Structures: Shed & Carport Rules (2026)
Shed permit rules in Westland, MI, also referred to as storage shed, backyard shed, or accessory building regulations, set size limits, setbacks, and when a building permit is required.
Key Facts
- Permit required
- Yes, for all sheds
- Fee basis
- Valuation-based, plus plan review
- No-permit penalty
- $110 plus permit fee
- Max height
- 14 ft (20 ft on large lots)
Summary
Westland requires a zoning compliance review and a valuation-based building permit fee for any shed, on top of a plan review fee, before construction begins.
Residential Zoning Compliance
Shed - fence - Concrete flatwork Per valuation - Plus Plan Review fee.
Moving of Buildings and Structures
Permit fee for each building (exclusive of foundation permit and any remodeling to structure)\$589.00
Substituted Plans
For substitution of plans by valuation.
Zoning Compliance—Commercial Business Occupancy
Change of occupancy, business ownership or new business\$400.00
Temporary Certificates of Occupancy
Residentially zoned property\$300.00
Business or industrial zoned property\$600.00
Administrative fee for all temporary certificates of occupancy for each year that the temporary certificate of occupancy is in effect\$354.00
Building Board of Appeal
Building Board of Appeals application\$1,000.00
Overtime Inspections
Saturday, Sunday, holiday or general overtime inspections made by any employee of the department shall be charged for at the following rate: 1½ times the hourly employee's pay (4-hour minimum).
Signs
Temporary sign permits (authorized by Ordinance No. 248 § 15:6.10)\$100.00
Refunds
Regulations in connection with the refunding of fees paid for unused permits, licenses and certificates of inspection and operation:
Requests for refunds must be made within six months from the date the permit, license, etc., was issued.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 66).
Full Breakdown
Westland's master fee schedule lists sheds under "Residential Zoning Compliance," charging the same fee structure as fences and concrete flatwork: a permit fee set by the project's valuation, plus a separate plan review fee, meaning even a small shed triggers a paid zoning compliance review before it goes up. The city's zoning ordinance separately caps detached accessory buildings such as sheds at 14 feet in height (up to 20 feet only on lots over a third of an acre), requires at least a 2-foot setback from any lot line, restricts them to the rear yard, and limits combined accessory building coverage to 40 percent of the rear yard.
Violations & Fines
Installing a shed without first obtaining the required permit adds a flat $110 fee on top of the standard permit fee; Code violations generally carry a fine up to $500, up to 90 days in jail, or both.
Frequently Asked Questions
Do I need a permit for a small backyard shed in Westland?
What if I build a shed without getting a permit first?
Sources & Official References
Other rules in Westland
How Westland compares: Shed Permit Requirements by City·Compare Westland to another location·View the Michigan accessory structures overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Shed & Carport Rules in Nearby Cities
How other cities in Wayne County handle shed & carport rules.