Key Facts

Permit issuer
Monroe County Building Department
City administrator
Transportation and traffic engineer
Owner-occupant exemption
Not for resale property
Appeal body
Indiana Fire Prevention & Building Safety Commission
Change-of-use/temp-use permit fee
$250 (Sec. 17.08.050)
Grading/site development fee
$115 per acre

Summary

In the City of Bloomington, a building permit is required whenever construction, alteration, demolition, moving, or repair work meets or exceeds the scope set out in Title 17 of the Bloomington Municipal Code. The Monroe County Building Department issues the permit itself, while the City's Planning and Transportation Department enforces the technical codes, inspects sites, and can halt work with a written stop-work order.

The provisions of this title shall serve as the administrative, organizational, and enforcement rules and regulations for the technical codes which regulate the site preparation and construction, alteration, moving, demolition, repair, use and occupancy of buildings, structures, building service equipment and systems within the City of Bloomington and its jurisdiction. ... No section or provision in this title is to be interpreted as prohibiting a property owner from doing work on a residence which he or she owns and in which he or she lives or plans to live. Property for resale is not included in this exemption. Permits are required when work or construction equals or exceeds the scope set forth in this title.

Full Breakdown

030. 060. 090 states that permits are required when work or construction equals or exceeds the scope set forth in Title 17, though it exempts a property owner doing work on a residence they own and occupy, an exemption that never extends to property held for resale. 010, is an official document issued by the Monroe County Building Department after a certificate of zoning compliance has been obtained from the City. 010, may appoint building inspectors, and can issue a written stop-work order for any work proceeding contrary to the title.

100: any Monroe County or City permit authorizing demolition must be approved by the Planning and Transportation Department for compliance with Titles 8 and 20, including the historic-preservation demolition-delay rules. C. C. 100.

Violations & Fines

Section 17.04.040 makes it a violation of the Bloomington Municipal Code to fail to comply with any Title 17 regulation; where no specific penalty is set, a violator faces the fines in the general penalty clause at Section 1.01.130. Continuing work after the transportation and traffic engineer issues a written stop-work order under Section 17.08.010(b) is itself a separate ordinance violation, and after a stop-work order or a permit denial the site or structure must be returned to its original condition.

Frequently Asked Questions

Who issues a building permit in the City of Bloomington?
The Monroe County Building Department issues the building permit itself, after the City's Planning and Transportation Department has issued a certificate of zoning compliance confirming the proposed work meets the Unified Development Ordinance, per Bloomington Municipal Code Section 20.07.010. The City administers Title 17's technical codes and inspections, but the county government prints and holds the permit record.
Does a homeowner doing their own work need a permit?
Yes. Section 17.04.090 lets a property owner work on a residence they own and live in without hiring a licensed contractor, but it does not waive the permit itself: permits are still required whenever the work equals or exceeds the scope set forth in Title 17, and the exemption never applies to property held for resale.
What happens if work continues after a stop-work order?
Section 17.08.010(b) lets the transportation and traffic engineer order work stopped in writing, and it is a violation of the city's ordinances to continue after that order. Section 17.04.040 then exposes the violator to the general penalty clause fines in Section 1.01.130 until the site or structure is returned to its original condition.
Do demolition permits need extra city sign-off?
Yes. Under Section 17.08.100, any demolition permit issued by Monroe County or the City must be approved by the Planning and Transportation Department, which checks compliance with Titles 8 and 20, including the historic-preservation demolition-delay waiting period for buildings on the City's historic sites survey.

Sources & Official References

Other rules in Bloomington

All Bloomington rules

Compare Bloomington to another location·View the Indiana building safety overview

Get notified when Building Permits in Bloomington, IN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.