Dunwoody, GA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit issuer
building official
Minor-repair exception
building official approval, no permit
Unfiled-permit abandonment
180 days after filing
Issued-permit lapse
180 days without starting work
Violation classification
misdemeanor, per-day offense (§ 8-30)

Summary

Dunwoody requires a permit from the building official before constructing, enlarging, altering, repairing, moving, or demolishing a building or structure, or installing a regulated electrical, gas, mechanical or plumbing system, under City Code Section 8-27, with a narrow exception for ordinary minor repairs.

(1)When required, any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure ... shall first make application to the building official and obtain the required permit for the work. ... (3)Minor repairs. Ordinary minor repairs may be made with the approval of the building official without a permit, provided that such repairs shall not violate any of the provisions of the construction codes. ... (5)Time limitations during plan review. An application for a permit for any proposed work shall be deemed to have been abandoned 180 calendar days after the date of filing for the permit, unless before then a permit has been issued. ... Any person, firm, corporation, or agent who shall violate a provision of the construction codes, or fail to comply therewith ... shall be guilty of a misdemeanor. Each such person shall be considered guilty of a separate offense for each and every day or portion thereof during which any violation ... is committed or continued.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 49).

Full Breakdown

Section 8-27(a)(1) sets the trigger: any owner, authorized agent, or contractor who wants to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to install a regulated electrical, gas, mechanical or plumbing system, "shall first make application to the building official and obtain the required permit for the work." The permit covers only what is shown on the drawings and specifications filed with the application, so work outside those documents needs a separate permit.

The Code carves out one exception in Section 8-27(a)(3): "ordinary minor repairs may be made with the approval of the building official without a permit," as long as the repair does not otherwise violate the construction codes; the building official decides case by case what qualifies. Applications do not sit open indefinitely. Under Section 8-27(a)(5), a permit application is "deemed to have been abandoned 180 calendar days after the date of filing," unless the permit issues first, though the building official may grant one or more 180-day extensions on a written, justified request. Once issued, a permit likewise lapses if work is not started, or is suspended, for 180 days.

Design professionals must seal drawings for larger or higher-risk projects: Group A, E and I occupancies, buildings three stories or taller, buildings 5,000 square feet or larger, and new residential structures over 2,500 square feet or two stories. A single-family dwelling outside those categories needs neither a sealed architect's nor engineer's drawing.

Violations & Fines

Building without the required permit, or continuing work in violation of the construction codes, is a misdemeanor under Section 8-30, with "a separate offense for each and every day or portion thereof" the violation continues. The building official may also issue a stop-work order and revoke a permit obtained on a misrepresented application under Section 8-26.

Frequently Asked Questions

Do I need a permit to remodel my Dunwoody home?
Yes, with one narrow exception. Section 8-27(a)(1) requires a permit from the building official before you construct, enlarge, alter, repair, or demolish a building or install a regulated electrical, gas, mechanical or plumbing system; only "ordinary minor repairs" approved by the building official are exempt.
How long is my building permit application good for before it expires?
An unissued application is deemed abandoned 180 calendar days after filing under Section 8-27(a)(5), though the building official can grant 180-day extensions in writing for justified cause.
What happens if I start construction without a permit?
It is a misdemeanor under Section 8-30, and each day the unpermitted work continues counts as a separate offense; the building official can also issue a stop-work order.

Sources & Official References

Other rules in Dunwoody

All Dunwoody rules

Compare Dunwoody to another location·View the Georgia building safety overview

Get notified when Building Permits in Dunwoody, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.