Key Facts

Adopted code
International Plumbing Code, Georgia DCA amendments
Permit trigger
Any new, altered or replaced plumbing system
Late-start penalty
100% of the usual permit fee
Application lapse
Abandoned after 180 days without a permit
Stop-work fine
Up to $1,000.00 per offense

Summary

Dunwoody adopts the Georgia-amended International Plumbing Code by ordinance and requires anyone doing plumbing work to first obtain a permit from the building official. A permit application must describe the work and pay the required fee, and starting work before the permit issues adds a penalty equal to the full permit fee on top of what is owed.

(6)Plumbing. The provisions of the International Plumbing Code, as adopted and amended by the state department of community affairs, shall apply to every plumbing installation, including alterations, repairs, replacement, equipment, appliances, fixtures, fittings, and appurtenances, and when connected to a water or sewerage system. ... (a)Permit application.(1)When required, any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert, or replace any electrical, gas, mechanical, or plumbing system, the installation of which is regulated by the construction codes, or to cause any such work to be done, shall first make application to the building official and obtain the required permit for the work. ... (2)Work commencing before permit issuance. Any person who commences any work on a building, structure, electrical, gas, mechanical, or plumbing, etc., system before obtaining the necessary permits, shall be subject to a penalty of 100 percent of the usual permit fee in addition to the required permit fees.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 49).

Full Breakdown

Section 8-23(a)(6) of the Dunwoody Code of Ordinances adopts the International Plumbing Code, as amended by the Georgia Department of Community Affairs, for every plumbing installation in the city, including alterations, repairs, replacements and connections to a water or sewerage system. Section 8-27 then sets the permitting mechanics that apply to that adopted code. Any owner, authorized agent or contractor who wants to construct, enlarge, alter, repair, move, demolish or change the occupancy of a plumbing system regulated by the construction codes must first apply to the building official and obtain the permit before starting work; only ordinary minor repairs that do not violate the codes may proceed without one.

Applications must be filed on a city form with the required fee and a description of the work, and a filed application is deemed abandoned if no permit issues within 180 calendar days, while an issued permit itself lapses if the authorized work is not started, or is suspended, for 180 days, subject to written extensions of up to 180 days at a time for justifiable cause. Once work begins, the code requires staged plumbing inspections, underground, rough-in and final, before the building official will release the next phase of construction; Section 8-1 also incorporates Section 312 of the International Plumbing Code for the required pressure and leak tests.

Anyone who begins plumbing work before the permit is issued is charged a penalty of 100 percent of the usual permit fee in addition to the fee itself, and the building official may revoke a permit that was obtained through a misrepresentation or that covers work being done in violation of the adopted codes.

Violations & Fines

Doing plumbing work without first securing a permit triggers a 100 percent penalty on top of the regular permit fee under Section 8-27(g)(2), and the building official can issue a stop-work order that carries a fine of up to $1,000.00 per offense for continuing work after the order is posted. A permit obtained through a false statement on the application, or covering work that violates the adopted plumbing code, can be revoked outright.

Frequently Asked Questions

Does every plumbing repair in Dunwoody need a permit?
No. Section 8-27(a)(3) allows ordinary minor repairs to be made with the building official's approval and without a permit, as long as the repair does not violate the adopted construction codes. Anything beyond a minor repair, such as replacing or extending a plumbing system, requires a permit application first.
What happens if a contractor starts plumbing work before the city issues the permit?
Section 8-27(g)(2) charges a penalty equal to 100 percent of the usual permit fee, in addition to the fee itself, for any work commenced before the necessary permits are obtained. The building official can also issue a stop-work order requiring the work to cease immediately.
How long is a Dunwoody plumbing permit valid once issued?
Under Section 8-27(f)(1), a permit becomes invalid if the authorized work is not started within 180 calendar days of issuance, or if it is suspended or abandoned for 180 days after starting. The building official may grant one or more 180-day extensions if requested in writing with justifiable cause.

Sources & Official References

Other rules in Dunwoody

All Dunwoody rules

Compare Dunwoody to another location·View the Georgia building safety overview

Get notified when Plumbing Permits in Dunwoody, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.