Flint, MI Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Issuing official
Building Inspector
Certificate type
Zoning certificate, part of permit
Decision deadline
30 days (§ 50-11)
Covers
Building, structure, or land use changes

Summary

In Flint, no one may build, alter, or change the use of a structure or lot until the Building Inspector issues a zoning certificate as part of the building permit, confirming the work conforms to the zoning chapter.

It shall be unlawful for any owner, lessee or tenant to use or permit the use of any structure, building or land, or part thereof, created, erected, changed, converted or enlarged, wholly or partly, until a zoning certificate, which is a part of the building permit, shall have been issued by the Building Inspector. The zoning certificate shall show that the building or premises or a part thereof, and the proposed use thereof, are in conformity with the provisions of this chapter. It shall be the duty of the Building Inspector to issue a zoning certificate; provided, that he or she is satisfied that the structure, building or premises, and the proposed methods of water supply and disposal of sanitary wastes, conform with all the requirements of this chapter.

(b)   No permit for excavation or construction shall be issued by the Building Inspector, unless the plans, specifications and the intended use conform to the provisions of this chapter. (Ord. 2046, passed 4-11-1968; Ord. 2412, passed 11-5-1973)

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2016 Code: Local legislation current through Ordinance 3821, passed 3-1-2012).

Full Breakdown

City of Flint Code § 50-9 makes it unlawful to use, erect, change, convert, or enlarge any structure or land until a zoning certificate, issued by the Building Inspector as part of the building permit, confirms conformity with the zoning chapter. The Building Inspector must issue the certificate once satisfied the structure and its proposed water supply and sanitary waste disposal methods meet all chapter requirements. No excavation or construction permit may be issued unless plans, specifications, and intended use conform to the zoning chapter. Applications go through the process set out at § 50-10, and the Building Inspector must act within 30 days under § 50-11.

Violations & Fines

Building or altering property without an approved zoning certificate is unlawful; the Building Inspector may withhold or refuse construction and excavation permits, and any permit issued in conflict with the zoning chapter is null and void under § 50-15.

Frequently Asked Questions

Do I need a separate zoning permit in Flint?
No: the zoning certificate is issued as part of the building permit by the Building Inspector, not as a standalone permit, per § 50-9.
What if the City doesn't respond to my application?
Under § 50-11, failure to notify you of a refusal within 30 days entitles you to the zoning certificate, unless you agreed to an extension.

Sources & Official References

Other rules in Flint

All Flint rules

Compare Flint to another location·View the Michigan building safety overview

Get notified when Building Permits in Flint, MI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.