Gordon County, GA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit section
Gordon County Code Sec. 4-38(a)(1)
Issuing office
Building inspection department
Accessory building exemption
10 feet by 12 feet or less, no panel board or utility
Application abandoned
Six (6) months after filing, absent a permit
Commercial poultry buildings
$0.04 per square foot
Early-start penalty
100 percent of the usual permit fee, added

Summary

In unincorporated Gordon County, Georgia, a building permit from the building inspection department is required before constructing, enlarging, altering, repairing, moving or demolishing a building or structure. Accessory buildings ten (10) feet by twelve (12) feet or less are exempt, unless they need a branch circuit panel board or utility service.

These county ordinances apply to unincorporated areas of Gordon County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(a)Permit application.(1)When required. Any owner, authorized agent or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by the technical codes, or to cause any such work to be done, shall first make application to the building inspection department and obtain the required permit for the work. ... Accessory buildings which are ten (10) feet by twelve (12) feet or less do not require a building permit. HOWEVER, any accessory building which requires a branch circuit panel board and/or a utility service shall be required to have a building permit. Accessory buildings which do not require a building permit are still required to meet all setback requirements as defined in the county zoning ordinance, codified herein as Chapter 18.

Full Breakdown

Sec. 4-38(a)(1) of the Gordon County Code requires any owner, authorized agent or contractor who wants to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure to apply to the building inspection department and get the permit first. Sec. 4-26(a) adopts the International Building Code and International Residential Code, with the other State of Georgia minimum standard codes, and the building inspector heads the department that enforces the article (Sec. 4-36).

The main exemption is the small accessory building. Ten (10) feet by twelve (12) feet or less needs no building permit, unless the building needs a branch circuit panel board or a utility service. Exempt buildings still meet every setback in the county zoning ordinance, Chapter 18. Ordinary minor repairs can proceed with the building inspector's approval and without a permit. Drawings and specifications are not required for accessory or agricultural buildings, except engineered metal buildings, which need manufacturer design data showing the load requirements are met.

The application, with the required fee, gives the actual lot dimensions, the size and location of the building, existing structures, the number of dwelling units and the layout of off-street parking and loading spaces. An architect or engineer must seal plans for Group A, E and I occupancies, buildings three (3) stories or more, and buildings of five thousand (5,000) square feet or more. Single-family dwellings, regardless of size, need neither. An application is abandoned six (6) months after filing unless a permit has issued, extensions run up to ninety (90) days each, and a permit lapses if work does not start within six (6) months of issue. The Board of Commissioners sets fees, and commercial poultry operation buildings pay $0.04 per square foot. Inspections cover foundation, frame and final stages, and a certificate of occupancy comes last. Sec. 4-51 adds footing rules: two runs of one-half (1/2) inch (#4) minimum steel rebar.

Violations & Fines

Starting work before the permit issues costs a penalty of one hundred (100) percent of the usual permit fee on top of the fees (Sec. 4-38(g)(2)). The building inspector can stop work by written notice (Sec. 4-37(c)) and revoke a permit issued on a false statement (Sec. 4-37(d)). Under Sec. 4-42 a violation is a misdemeanor, each day a separate offense, tried in magistrate court, and the county or a damaged person can seek an injunction.

Frequently Asked Questions

Do I need a permit for a shed in unincorporated Gordon County?
Not for an accessory building of ten (10) feet by twelve (12) feet or less, under Sec. 4-38(a)(1). The exemption ends if the building needs a branch circuit panel board or a utility service. Even an exempt building must meet all setback requirements in the county zoning ordinance, Chapter 18, so the location still matters.
Do I need an architect for my house plans?
No for a single-family dwelling. Sec. 4-38(b)(3) says single-family dwellings, regardless of size, need neither a registered architect or engineer nor a certification that one is not required. Seals are required for Group A, E and I occupancies, buildings three (3) stories or more, and buildings of five thousand (5,000) square feet or more.
How long is a building permit application valid?
Under Sec. 4-38(a)(5) an application is deemed abandoned six (6) months after filing unless a permit has issued. The building inspector can allow extensions of not more than ninety (90) days each if requested in writing with justifiable cause. An issued permit also lapses if work is not commenced within six (6) months of issue.
What is the fee for a commercial poultry house permit?
Sec. 4-38(g)(6) says the Gordon County Board of Commissioners has set building permit fees for commercial poultry operation buildings at four cents ($0.04) per square foot. Other permit fees are established from time to time by the board of commissioners and posted in the building inspection department, and a permit does not issue until they are paid.
What inspections follow a building permit?
Sec. 4-38(h)(5) lists a foundation inspection after trenches are excavated and forms erected, a frame inspection after the roof, framing, fire blocking and bracing are in place, and a final inspection when the building is ready for occupancy. Work cannot pass a stage without a written release from the building inspector.

Sources & Official References

Other rules in Gordon County

All Gordon County rules

Compare Gordon County to another location·View the Georgia building safety overview

Get notified when Building Permits in Gordon County, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.