Gordon County, GA Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit section
Gordon County Code Sec. 4-38(a)(1)
Adopted plumbing code
International Plumbing Code (Sec. 4-26(a)(5))
Issuing office
Building inspection department
Inspections
Underground, rough-in with pressure test, final
Start-without-permit penalty
100 percent of the usual permit fee, added
Application abandoned
Six (6) months after filing, absent a permit

Summary

In unincorporated Gordon County, Georgia, anyone who installs, alters, repairs, removes, converts or replaces a plumbing system regulated by the technical codes must first apply to the building inspection department and obtain a permit. The county enforces the International Plumbing Code, with underground, rough-in and final plumbing inspections.

These county ordinances apply to unincorporated areas of Gordon County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(a)Permit application.(1)When required. Any owner, authorized agent or contractor who desires to ... erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, ... shall first make application to the building inspection department and obtain the required permit for the work. ... 1.Underground inspection: ... To be made after trenches or ditches are excavated, ... piping installed, and before any backfill is put in place.2.Rough-in inspection: To be made after the roof, framing, fire blocking and bracing are in place and all soil, waste and vent piping is complete, and prior to the installation of wall or ceiling membranes. This inspection shall include a pressure test which shall be performed by the contractor.3.Final inspection: To be made after the building is complete, all plumbing fixtures are in place and properly connected, and the structure is ready for occupancy.

Full Breakdown

Sec. 4-38(a)(1) of the Gordon County Code requires an owner, authorized agent or contractor to apply to the building inspection department and obtain the required permit before erecting, installing, enlarging, altering, repairing, removing, converting or replacing any electrical, gas, mechanical or plumbing system regulated by the technical codes. Sec. 4-26(a) adopts the International Plumbing Code, with the other State of Georgia minimum standard codes and chapter 1 (Scope and Administration), in the latest editions as adopted and amended by the state. Sec. 4-36(c)(1)e applies the plumbing provisions to every plumbing installation, including alterations, repairs, replacement, equipment, appliances, fixtures, fittings and appurtenances, and when connected to a water or sewerage system. That subsection still names the Standard Plumbing Code.

The application, with the required fee, goes on the department's form, signed by the owner or authorized agent, with a general description of the work and its location. Work not shown on the drawings and specifications filed with the application needs a separate permit. Ordinary minor repairs can be made with the building inspector's approval and without a permit if they do not violate the technical codes (Sec. 4-38(a)(3)). An application is deemed abandoned six (6) months after filing unless a permit has issued, and the inspector can grant extensions of not more than ninety (90) days each on written request. Where the state requires a contractor license, the contractor supplies the license number before receiving the permit.

Plumbing work gets the three inspections quoted above: underground before backfill, rough-in with a pressure test performed by the contractor, and final. Sec. 4-38(h)(6) and (7) bar further work, or covering plumbing work, without a written release from the building inspector. Permit fees are set by the Board of Commissioners and posted in the building inspection department, and no permit issues until they are paid. Utility connections wait for the building inspector's release and a certificate of occupancy or completion (Sec. 4-38(i)(3)).

Violations & Fines

Anyone who starts plumbing work before obtaining the permit owes a penalty of one hundred (100) percent of the usual permit fee on top of the permit fees (Sec. 4-38(g)(2)). The building inspector can issue a written stop work order (Sec. 4-37(c)) and revoke a permit for false statements or nonconforming work (Sec. 4-37(d)). Under Sec. 4-42 a violation is a misdemeanor, each day is a separate offense, and the magistrate court has jurisdiction. Injunctive relief is also available.

Frequently Asked Questions

When is a plumbing permit required in unincorporated Gordon County?
Sec. 4-38(a)(1) requires a permit before anyone erects, installs, enlarges, alters, repairs, removes, converts or replaces a plumbing system regulated by the technical codes. The application goes to the building inspection department. Ordinary minor repairs can be made without a permit only with the building inspector's approval and only if they do not violate the technical codes.
Which plumbing code does Gordon County enforce?
Sec. 4-26(a)(5) adopts the International Plumbing Code, along with the International Swimming Pool and Spa Code and the other State of Georgia minimum standard codes, in the latest editions as adopted and amended by the state. Sec. 4-36(c)(1)e, which describes scope, still refers to the Standard Plumbing Code.
What plumbing inspections does the county make?
Sec. 4-38(h)(5) lists three: an underground inspection after trenches are excavated and piping installed but before backfill, a rough-in inspection after soil, waste and vent piping is complete and before wall or ceiling membranes, including a contractor-performed pressure test, and a final inspection when fixtures are in place and connected.
What is the penalty for starting plumbing work without a permit?
Sec. 4-38(g)(2) adds a penalty of one hundred (100) percent of the usual permit fee to the required permit fees. Sec. 4-42 also makes a violation of the article a misdemeanor, with each day or portion of a day a separate offense, and the building inspector can order work stopped in writing under Sec. 4-37(c).
How long is a plumbing permit application good for?
Sec. 4-38(a)(5) deems an application abandoned six (6) months after filing unless a permit has issued before then. The building inspector can allow one or more extensions of not more than ninety (90) days each if the applicant requests it in writing and shows justifiable cause.

Sources & Official References

Other rules in Gordon County

All Gordon County rules

Compare Gordon County to another location·View the Georgia building safety overview

Get notified when Plumbing Permits in Gordon County, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.