Jefferson County, AL Building Safety: Building Permits (2026)
Key Facts
- Governing code
- Building Code of Jefferson County, Alabama, 2018
- Permit trigger
- Construct, alter, move, demolish, change occupancy
- Minor repairs
- Exempt with Building Official approval
- Temporary structures
- Need time-limited special permit
- Unpermitted work
- Still requires permit plus added fee
- Penalty
- Up to $500 fine/30 days jail + $50/day
- Records retention
- Permit fee records kept 7 years
Summary
In unincorporated Jefferson County, anyone who wants to build, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or erect a sign, install fire-extinguishing apparatus, or install a boiler, furnace or incinerator, must first apply to the Building Official and obtain a permit before starting work.
105.1 - WHEN REQUIRED 105.1.1. General. Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, or construct a sign of any description, or to install or alter fire extinguishing apparatus, engines, or to install a steam boiler, furnace, heater, incinerator, heat producing apparatus, or other appurtenances, the installation of which is regulated by this Code, or to cause any such work to be done, shall first make application to the Building Official and obtain the required permit for the work.
Full Breakdown
Building Code of Jefferson County, Alabama, 2018 § 105.1.1 sets the baseline: any owner, authorized agent or contractor who wants to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, erect a sign, install or alter fire-extinguishing apparatus, or install a steam boiler, furnace, heater or incinerator must first apply to the Building Official and obtain the required permit before the work begins. Ordinary minor repairs may proceed without a permit if the Building Official approves and the work doesn't otherwise violate the Code or other county/state law (§ 105.1.2).
Temporary structures, construction sheds, seats, canopies, tents and fences used solely for construction, need a special time-limited permit before erection and must be removed when that limit expires (§ 105.1.3.1). If work starts before a permit is issued, § 107.2 requires the person to still obtain the permit and pay all required fees, and each additional violation within a 12-month period triggers a further minimum fee under § 107.5's schedule; a belated permit does not waive prosecution under § 113. The Building Official may revoke a permit for a false statement or material misrepresentation in the application, with no refund of fees (§ 103.3.1), or for work that violates the Code (§ 103.3.2).
Permit and fee accounting records must be kept a minimum of seven years (§ 107.4). Refund requests must be filed within six months of issuance, carry a $50 administrative charge, and are barred once 60 days have passed on a duplicate/re-permitted job (§ 106.5).
Violations & Fines
Violating any provision of the Building Code, or failing to correct a violation within ten days of written notice from the Director of Development Services, is a misdemeanor punishable by a fine of up to $500, up to 30 days in jail, or both, plus a separate $50-per-day penalty for each day the violation continues (§ 113). Starting work without a permit also exposes the responsible party to the minimum fee under the § 107.5 schedule on top of the standard permit fee.
Frequently Asked Questions
Do I need a permit for minor repairs in Jefferson County?
What if I start construction before getting a permit?
What happens if my building permit is revoked?
Do temporary construction structures need a permit?
Sources & Official References
Other rules in Jefferson County
Compare Jefferson County to another location·View the Alabama building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.