Vestavia Hills, AL Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
City Code § 5-26
Permit fee
$9.00 per $1,000 valuation plus $41 issuance
Minimum permit fee
$50.00 including issuance fee
No-permit penalty
$100 fine plus doubled permit fee
Permit lapses
After 90 days of inactive work
Appeal path
Board of Zoning Adjustment

Summary

Vestavia Hills requires a permit before any construction, alteration, repair, demolition, or occupancy change to a building or structure, and before altering electrical, gas, mechanical, or plumbing systems. The Building Safety code official issues permits under City Code § 5-26, with fees set by § 5-51 and a doubled fee plus a $100 penalty for starting work first.

Sec. 5-26. - Application. Any person who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building, tenant space, or structure, or to erect, install, enlarge, alter, repair, remove, convert, or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by the codes listed in this chapter or to cause any such work to be done shall first make application to the code official and obtain the required permit. ... (b)Permit fees. The permit fee shall be $9.00 for each $1,000.00, or fraction thereof, of the contract or estimated cost, whichever is greater, plus $41.00 issuance fee.(c)Minimum permit fee. The minimum permit fee shall be $50.00 including issuance fee. ... (g)Double permit fee. When work requiring a permit is commenced prior to obtaining a permit, the permit applicant shall be required to pay a penalty of $100.00 plus a double permit fee.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 6).

Full Breakdown

Under City of Vestavia Hills Code of Ordinances § 5-26, anyone who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building, tenant space, or structure, or to erect, install, enlarge, alter, repair, remove, convert, or replace an electrical, gas, mechanical, or plumbing system regulated by the city's technical codes, must first apply to the code official in the Department of Building Safety and obtain the required permit before work begins. The city has adopted the International Building Code, 2021 edition, with local amendments under § 5-71.

00. 00 for renovations. 00 penalty plus a doubled permit fee. Under § 5-1, the code official can refuse to issue further permits to a contractor whose work fails to conform to city codes after ten days' notice. Permits are valid only for continuous work: if work stops for 30 days before the exterior is complete, the permit must be renewed at half the original cost, and it expires outright after 90 days of inactivity, after which the property can be referred for a public-nuisance declaration under state law. Anyone denied a permit by the Building Official can appeal to the Board of Zoning Adjustment for review of that decision.

Violations & Fines

Starting work without a permit costs a $100.00 penalty on top of double the normal permit fee under § 5-51(g), and paying it does not excuse compliance with the underlying codes. General code violations are punishable under § 1-5 by a fine of $1.00 to $500.00 and up to six months of imprisonment or hard labor, at the municipal court's discretion, with continuing violations chargeable day by day.

Frequently Asked Questions

Do I need a permit to remodel a bathroom in Vestavia Hills?
Yes. City Code § 5-26 requires a permit for any alteration to a building or its electrical, gas, mechanical, or plumbing systems, not just new construction. You apply to the code official in the Department of Building Safety before work begins, and a residential plan review fee of $25.00 to $100.00 applies depending on the scope.
What happens if I start work before getting a permit in Vestavia Hills?
Section 5-51(g) requires a $100.00 penalty on top of a doubled permit fee. Paying it does not excuse you from meeting every requirement of the applicable codes, and the code official can still require corrections or refuse future permits under § 5-1 if the work does not conform.
How much does a building permit cost in Vestavia Hills?
Under § 5-51(b) and (c), the fee is $9.00 for each $1,000.00 of contract or estimated cost, plus a $41.00 issuance fee, with a $50.00 minimum. Commercial projects also pay a separate plan review fee starting at $250.00 for work under $50,000.00 in value.
How long does a Vestavia Hills building permit stay valid?
It covers continuous work only. If work stops for 30 days while the exterior is unfinished, you must renew at half the original fee, and the permit expires outright after 90 days of inactivity, after which the property can be referred for a public-nuisance case under state law.

Sources & Official References

Other rules in Vestavia Hills

All Vestavia Hills rules

Compare Vestavia Hills to another location·View the Alabama building safety overview

Get notified when Building Permits in Vestavia Hills, AL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.