Rochester, NY Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
§ 39-207, Chapter 39
Permit needed before
any work commences
Issuing office
Buildings & Zoning (NBD)
No-permit penalty
$235 residential / $475 commercial min
Base permit fee
from $75 (§ 39-221)

Summary

In Rochester, no one may start the construction, enlargement, alteration, improvement, relocation, or demolition of any building or structure until the city issues a building permit under Chapter 39. The requirement also reaches solid-fuel heating appliances, chimneys, and flues that must meet the Building or Energy Code.

Except as otherwise provided in Subsection B of this section, a building permit shall be required for any work which must conform to the Building Code and/or the Energy Code, including, but not limited to, the construction, enlargement, alteration, improvement, removal, relocation or demolition of any building or structure or any portion thereof, and the installation of a solid-fuel-burning heating appliance, chimney or flue. No person shall commence any work for which a building permit is required without first having obtained such permit.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4935326; v86 updated 2026-06-16; through 06-16-2026).

Full Breakdown

Rochester City Code § 39-207 requires a building permit for any work that must conform to the New York State Uniform Code or Energy Code: construction, enlargement, alteration, improvement, removal, relocation, or demolition of a building or structure, plus solid-fuel appliances, fences over two feet above grade, decks, new or replacement cladding, and paved areas of 2,000 square feet or more. Applications go to the Division of Buildings and Zoning under the Commissioner of Neighborhood and Business Development. Permit fees under § 39-221 scale with actual project cost, starting at $75. No work may commence until the permit is issued.

Violations & Fines

Performing permit-required work without a permit triggers a penalty under § 39-225 equal to the applicable permit fee, but no less than $235 for residential work and $475 for commercial work, charged on top of the regular permit fee.

Frequently Asked Questions

Do I need a permit for a fence or deck in Rochester?
Yes. Rochester requires a building permit for a fence, wall, or retaining wall over two feet above average grade, and for decks. Both are on the § 39-207 list of permit-required work.
What happens if I build without a permit in Rochester?
Under § 39-225 you pay a penalty equal to the permit fee, at least $235 for residential or $475 for commercial work, plus the standard fee. Work cannot proceed until it is legalized.
How much does a Rochester building permit cost?
Fees under § 39-221 scale with actual project cost, starting at $75 for work up to $2,000 and rising with valuation. Demolition, decks, and pools carry their own set fees.

Sources & Official References

Other rules in Rochester

All Rochester rules

New York rules heatmap·Compare Rochester to another location·View the New York building safety overview

Get notified when Building Permits in Rochester, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.