Seaside, OR Building Safety: Building Permits (2026)
Key Facts
- Governing law
- Seaside Code of Ordinances Chapter 150, Building Regulations
- Scope
- Construction, alteration, moving, demolition, repair and maintenance of buildings and structures
- Permit void if work not begun
- Within 180 days of the permit date
- Completion deadline
- Final inspection within 24 months of the permit date
- Work-without-permit fee
- Equal to the permit fee, never less than $50
- Maximum fine
- $1,000 on conviction in municipal court
- Transfer of permit
- Not transferable to another person or firm
Summary
Seaside applies its building code, Chapter 150 of the Code of Ordinances, to the construction, alteration, moving, demolition, repair and maintenance of any building or structure except work in a public way. Work that needs a permit and starts without one triggers a special investigation and a fee equal to the permit fee, never less than $50.
(A) This code shall apply to the construction, ... alteration, moving, demolition, repair, maintenance and work associated with any building or structure ... except those located in a public way. ... (A) Whenever any work for which a permit is ... required by this subchapter has been commenced ... without first obtaining the permit, a special investigation shall be made before a permit may be ... (B) An investigation fee in the amount equal to ... the permit fee but not less than $50, in addition to the ... permit fee and any assessment penalty, may be ... collected whether or not a permit is then or subsequently issued.
Full Breakdown
Chapter 150 calls itself the City of Seaside Building Code (§ 150.55), and § 150.57(A) sets its reach: the construction, alteration, moving, demolition, repair, maintenance and work associated with any building or structure, except those located in a public way. Where the subchapter and Oregon Revised Statutes conflict, the statute governs (§ 150.57(C)). The structural code enforced is the Oregon Structural Specialty Code as adopted by OAR 918-460-0010 through 918-460-0015, alongside the Oregon Residential Specialty Code (§ 150.73(A), (F)).
The Building Official reviews the application, plans, specifications and computations, and other city departments can review the plans to verify compliance with the laws under their jurisdiction. When the work conforms and the fees are paid, the Building Department issues the permit and the Building Official stamps the approved plans, which cannot be changed without the Building Official's authorization (§ 150.70(A)). A partial permit for part of a building can be issued before all plans are approved, but its holder proceeds without assurance that the permit for the entire building will be granted. One set of approved plans must stay on the site at all times while work is in progress (§ 150.70(B)). A permit is not transferable to another person or firm (§ 150.70(F)), and the Building Official can suspend or revoke one in writing if it was issued in error on incorrect information or if the activity violates the Code of Ordinances (§ 150.70(G)).
The clock matters. A plan review application with no permit issued within 180 days expires, with one extension of up to 180 days when circumstances beyond the applicant's control prevented action; renewal means resubmitting plans and paying a new plan review fee (§ 150.70(D)). An issued permit becomes null and void if work is not commenced within 180 days of the permit date, if work is suspended or abandoned for 180 days after it starts, or if the work is not completed and given a final inspection within 24 months of the permit date (§ 150.02(B)(1)). Permit fees are the rates the City Council adopts by resolution, and the Building Official can authorize an 80% refund of building permit fees (§ 150.74).
Violations & Fines
Starting work that requires a permit before obtaining it brings a special investigation before any permit can issue, plus an investigation fee equal to the permit fee, not less than $50 (§ 150.71). The Building Official can order the work stopped by written notice (§ 150.64). A Chapter 150 violation with no specific penalty is punished on conviction in municipal court by a fine not to exceed $1,000, and the condition is also a public nuisance the city can abate (§ 150.99(A), (C)).
Frequently Asked Questions
What happens if I start building in Seaside before I have a permit?
How long is a Seaside building permit valid?
Can a Seaside building permit be transferred to another contractor?
Who sets Seaside building permit fees?
Sources & Official References
Other rules in Seaside
Compare Seaside to another location·View the Oregon building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.