Skip to main content

Seaside, OR Building Safety: Electrical Permits (2026)

Light Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified November 2026

Key Facts

State code enforced
Oregon Electrical Specialty Code, OAR 918-290-0010 (§ 150.73(E))
Enforcing officer
Building Official (§ 150.61)
Emergency disconnection
Fuel-gas and other energy supplies (§ 150.65)
Disconnection notice
Written, within 24 hours (§ 150.66(B))
Reconnection
Only after the Building Official specifically authorizes it
Fine ceiling
$1,000 on conviction (§ 150.99(A))

Summary

Seaside enforces the Oregon Electrical Specialty Code, as adopted by OAR 918-290-0010, as part of its building regulations subchapter. The Building Official can disconnect energy supplies to eliminate an immediate hazard, and no one can reconnect disconnected equipment until the Building Official specifically authorizes it.

The Building Official shall have the authority to disconnect fuel-gas utility service, and/or other energy ... supplies to a building, structure, premises or equipment regulated by this subchapter when ... necessary to eliminate an immediate hazard to life or ... property. ... No person shall make a connection to or from an ... energy, fuel or power supply to any equipment ... regulated by this subchapter which has been ... disconnected or ordered disconnected or discontinued by the Building Official until the Building Official ... specifically authorizes the re-connection and/or use of ... such equipment. ... (E) The Oregon Electrical Specialty Code, as ... adopted by OAR 918-290-0010, is enforced as part of ... this subchapter.

Full Breakdown

Seaside does not write its own electrical standards. Section 150.73(E) provides that the Oregon Electrical Specialty Code, as adopted by OAR 918-290-0010, is enforced as part of the building regulations subchapter, the same subchapter that enforces the structural code (§ 150.73(A)), the mechanical code (§ 150.73(C)), the plumbing code (§ 150.73(D)) and the residential code (§ 150.73(F)). The Building Official runs the city's Code Enforcement Agency (§ 150.61(A)) and is authorized to enforce all provisions of the subchapter (§ 150.61(B)).

The remedies in the same subchapter reach electrical installations. Under § 150.65 the Building Official can disconnect fuel-gas utility service or other energy supplies to a building, structure, premises or equipment regulated by the subchapter when necessary to eliminate an immediate hazard to life or property. Whenever possible the Building Department notifies the serving utility, the owner and the occupant before disconnecting, and gives them written notice within a reasonable time afterward. Section 150.66 requires the Building Official to order hazardous equipment removed or restored to a safe condition by written notice with a fixed time limit for compliance, and persons shall not use the defective equipment after receiving the notice. When equipment or an installation is to be disconnected, written notice of the disconnection and its causes goes to the involved utility, the owner or the occupant within 24 hours (§ 150.66(B)). Once equipment has been disconnected or ordered disconnected, § 150.67 bars anyone from making a connection to or from an energy, fuel or power supply to it until the Building Official specifically authorizes re-connection or use.

Permit mechanics sit in the neighboring sections. Work for which a permit is required that starts without one brings the special investigation and an investigation fee equal to the permit fee, not less than $50 (§ 150.71). Permit holders must request inspections and keep work accessible and exposed (§ 150.72), and the Building Official can issue written stop work orders (§ 150.64). The fee section, § 150.74(A), names building, plumbing and mechanical permit fees as the rates the Council adopts by resolution.

Violations & Fines

Using equipment after receiving a written hazard notice, or connecting a power or energy supply to disconnected equipment before the Building Official authorizes re-connection, violates §§ 150.66 and 150.67. Chapter 150 violations with no specific penalty carry a fine not to exceed $1,000 on conviction in municipal court (§ 150.99(A)), and a violating condition is a public nuisance the city can abate (§ 150.99(C)). Section 150.67 carries the notation Penalty, see § 150.99.

Frequently Asked Questions

Which electrical code does Seaside enforce?
The Oregon Electrical Specialty Code, as adopted by OAR 918-290-0010. Section 150.73(E) states it is enforced as part of the building regulations subchapter, administered by the Building Official. The city's section points to the state specialty code rather than restating wiring standards, and places enforcement with the Code Enforcement Agency under the Building Official.
Can the city shut off power to a Seaside building?
Yes, in an emergency. Section 150.65 authorizes the Building Official to disconnect fuel-gas utility service or other energy supplies when necessary to eliminate an immediate hazard to life or property. Whenever possible the Building Department notifies the serving utility, the owner and the occupant first, and it gives written notice within a reasonable time after the disconnection.
Can I reconnect power myself after an ordered disconnection?
No. Section 150.67 says no person shall make a connection to or from an energy, fuel or power supply to equipment that has been disconnected or ordered disconnected or discontinued by the Building Official until the Building Official specifically authorizes the re-connection or use of that equipment. The section carries a penalty cross-reference to § 150.99.
How fast must a disconnection be put in writing?
Within 24 hours. Section 150.66(B) requires written notice of the disconnection, including the causes, to the involved utility, the owner or the occupant of the building when equipment or an installation is to be disconnected. A hazardous-equipment order under § 150.66(A) must also be in writing and contain a fixed time limit for compliance.

Sources & Official References

Other rules in Seaside

All Seaside rules

Compare Seaside to another location·View the Oregon building safety overview

Get notified when Electrical Permits in Seaside, OR changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.