Seaside, OR Building Safety: Electrical Permits (2026)
Key Facts
- State code enforced
- Oregon Electrical Specialty Code, OAR 918-290-0010 (§ 150.73(E))
- Enforcing officer
- Building Official (§ 150.61)
- Emergency disconnection
- Fuel-gas and other energy supplies (§ 150.65)
- Disconnection notice
- Written, within 24 hours (§ 150.66(B))
- Reconnection
- Only after the Building Official specifically authorizes it
- Fine ceiling
- $1,000 on conviction (§ 150.99(A))
Summary
Seaside enforces the Oregon Electrical Specialty Code, as adopted by OAR 918-290-0010, as part of its building regulations subchapter. The Building Official can disconnect energy supplies to eliminate an immediate hazard, and no one can reconnect disconnected equipment until the Building Official specifically authorizes it.
The Building Official shall have the authority to disconnect fuel-gas utility service, and/or other energy ... supplies to a building, structure, premises or equipment regulated by this subchapter when ... necessary to eliminate an immediate hazard to life or ... property. ... No person shall make a connection to or from an ... energy, fuel or power supply to any equipment ... regulated by this subchapter which has been ... disconnected or ordered disconnected or discontinued by the Building Official until the Building Official ... specifically authorizes the re-connection and/or use of ... such equipment. ... (E) The Oregon Electrical Specialty Code, as ... adopted by OAR 918-290-0010, is enforced as part of ... this subchapter.
Full Breakdown
Seaside does not write its own electrical standards. Section 150.73(E) provides that the Oregon Electrical Specialty Code, as adopted by OAR 918-290-0010, is enforced as part of the building regulations subchapter, the same subchapter that enforces the structural code (§ 150.73(A)), the mechanical code (§ 150.73(C)), the plumbing code (§ 150.73(D)) and the residential code (§ 150.73(F)). The Building Official runs the city's Code Enforcement Agency (§ 150.61(A)) and is authorized to enforce all provisions of the subchapter (§ 150.61(B)).
The remedies in the same subchapter reach electrical installations. Under § 150.65 the Building Official can disconnect fuel-gas utility service or other energy supplies to a building, structure, premises or equipment regulated by the subchapter when necessary to eliminate an immediate hazard to life or property. Whenever possible the Building Department notifies the serving utility, the owner and the occupant before disconnecting, and gives them written notice within a reasonable time afterward. Section 150.66 requires the Building Official to order hazardous equipment removed or restored to a safe condition by written notice with a fixed time limit for compliance, and persons shall not use the defective equipment after receiving the notice. When equipment or an installation is to be disconnected, written notice of the disconnection and its causes goes to the involved utility, the owner or the occupant within 24 hours (§ 150.66(B)). Once equipment has been disconnected or ordered disconnected, § 150.67 bars anyone from making a connection to or from an energy, fuel or power supply to it until the Building Official specifically authorizes re-connection or use.
Permit mechanics sit in the neighboring sections. Work for which a permit is required that starts without one brings the special investigation and an investigation fee equal to the permit fee, not less than $50 (§ 150.71). Permit holders must request inspections and keep work accessible and exposed (§ 150.72), and the Building Official can issue written stop work orders (§ 150.64). The fee section, § 150.74(A), names building, plumbing and mechanical permit fees as the rates the Council adopts by resolution.
Violations & Fines
Using equipment after receiving a written hazard notice, or connecting a power or energy supply to disconnected equipment before the Building Official authorizes re-connection, violates §§ 150.66 and 150.67. Chapter 150 violations with no specific penalty carry a fine not to exceed $1,000 on conviction in municipal court (§ 150.99(A)), and a violating condition is a public nuisance the city can abate (§ 150.99(C)). Section 150.67 carries the notation Penalty, see § 150.99.
Frequently Asked Questions
Which electrical code does Seaside enforce?
Can the city shut off power to a Seaside building?
Can I reconnect power myself after an ordered disconnection?
How fast must a disconnection be put in writing?
Sources & Official References
Other rules in Seaside
Compare Seaside to another location·View the Oregon building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.