Skip to main content
CityRuleLookup

Southfield, MI Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
City Code § 5.202
Permitting authority
Director, Bldg & Safety Engineering
Decision deadline
10 days after complete application
Accessory building exception
no separate permit if concurrent
Penalty
$25-$500 fine, up to 90 days jail
Certificate of occupancy
required before occupancy

Summary

In the City of Southfield, it is unlawful to build, alter, move or change the use of any structure or land without a building permit issued by the director of the Department of Building and Safety Engineering. Sec. 5.202 of the zoning chapter requires the application before work starts, and the director must issue or refuse the permit, in writing, within ten days of a complete application.

(1)It shall be unlawful to build or use or permit the building or use of any structure or land or part thereof hereafter created, erected, altered or moved or to change or enlarge the use of any building or land or part thereof until a building permit in accordance with the provisions of this chapter and all other applicable codes and ordinances of the city properly endorsed as to occupancy in a manner herein provided shall have been issued by the director of the department of building and safety engineering hereinafter authorized. ... No structure shall be started and no building or structure shall be moved onto any parcel of land in this city prior to the issuance of a permit. ... Whenever the buildings, land and uses thereof as set forth on the application are in conformity with the provisions of this chapter and all other applicable provisions of the City Code, it shall be the duty of the director of the department of building and safety engineering to issue a building permit within ten (10) days after the receipt of such application.

Full Breakdown

Sec. 5.202 makes it unlawful to build, alter, move or change the use of any structure or land, or part of one, until a building permit has been issued by the director of the Department of Building and Safety Engineering, and no structure can be started or moved onto a parcel before that permit issues. The application must be filed before the new or enlarged use is meant to begin, accompanied by a duplicate plot plan drawn at a scale of at least one inch to 100 feet showing lot lines, abutting street widths, existing and proposed grades and drainage, and the size, position and height of every building or structure involved, plus duplicate scaled plans of the proposed structure or alteration.

Non-residential applicants must also submit a sworn statement of every intended use. Accessory buildings erected at the same time as the principal building and shown on that building's application do not need a separate permit. Once the application conforms to the zoning chapter and the rest of the City Code, the director must issue the permit within ten days and post it conspicuously on the premises, and any refusal must be stated in writing with the director's reasons. A final inspection follows within ten days of notice that the building is ready for occupancy, and the director can issue a temporary certificate of occupancy for a completed portion of a project if occupying it early won't endanger life or public welfare, fixing a deadline for finishing the rest.

Architects, engineers, contractors and builders share the duty of confirming every required permit, including the certificate of occupancy, has actually been obtained before work proceeds or a building is occupied.

Violations & Fines

Building, altering or moving a structure without the required permit, or occupying one without a certificate of occupancy, violates the zoning chapter under Sec. 5.202(5), and the penalty in Sec. 5.206 runs $25.00 to $500.00 per offense, up to 90 days in the county jail, or both, with each day a violation continues counting as a separate offense. The zoning chapter also treats unpermitted construction as a nuisance per se, letting the city sue in circuit court to force it abated.

Frequently Asked Questions

When do I need a building permit in Southfield?
Anytime you build, alter, move or change the use of a structure or land, per Sec. 5.202. The permit application must be filed before work or the new use begins, and no structure can be moved onto a parcel or construction started until the Department of Building and Safety Engineering issues the permit.
How long does Southfield have to approve or deny a building permit?
Ten days from receipt of a complete application, per Sec. 5.202(2). If the plans and proposed use conform to the zoning chapter and the rest of the City Code, the director must issue the permit within that window; if not, the refusal must be in writing with the stated reasons.
Does an accessory building need its own permit in Southfield?
No, if it's built at the same time as the principal building and shown on that building's application, Sec. 5.202(2) exempts it from a separate building permit. An accessory structure built later, on its own, still needs its own application and permit before construction starts.
What happens if I build without a permit in Southfield?
It's a zoning chapter violation under Sec. 5.202(5), punishable under Sec. 5.206 by a fine of $25.00 to $500.00 per offense, up to 90 days in the county jail, or both, and the city can also sue in circuit court to have the unpermitted work declared a nuisance per se and abated.

Sources & Official References

Other rules in Southfield

All Southfield rules

Compare Southfield to another location·View the Michigan building safety overview

Get notified when Building Permits in Southfield, MI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Nearby Cities

How other cities in Oakland County handle building permits.

Farmington Hills, MI
Some Restrictions