Spokane Valley, WA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Governing code
Washington State Building Code (IBC/IRC)
Shed exemption
One story, under 200 square feet
Low deck exemption
30 inches or less above grade
Application validity
One year, extensions up to 180 days
Permit expiration
Two years from issuance if unstarted
Unpermitted work fee
Investigation fee equal to permit fee
Max misdemeanor fine
$1,000 and 90 days jail

Summary

Spokane Valley adopts the Washington State Building Code, including the International Building and Residential Codes, under Title 24 SVMC. A permit is required for most construction, but the city exempts small one-story accessory sheds and low decks, sidewalks and driveways from that requirement.

The City hereby amends the adopted State Building Code as follows: A. The International Building Code. 1. Amend Section 105, Permits, as follows: a. Section 105.2, Work exempt from permit, Building: 1. to read as follows: One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses provided the floor area does not exceed 200 square feet (11.15 m2). b. Section 105.2, Work exempt from permit, Building: Item 6. to read as follows: Item 6. Decks, sidewalks and driveways not more than 30 inches (762 mm) above the lowest adjacent ground level within six feet horizontally of the edge of the deck, sidewalk or driveway and where a guardrail is not required by other sections of this code, and not over any basement or story below and are not part of an accessible route.

Full Breakdown

020, incorporating the International Building Code and International Residential Code with Washington amendments, and that adoption is what makes a permit the default requirement for building work citywide. 040(A)(1): a one-story detached accessory structure such as a tool shed or playhouse skips a permit only if its floor area stays under 200 square feet, and a deck, sidewalk or driveway is exempt only if it sits no more than 30 inches above adjacent grade, needs no guardrail, is not over a basement or story, and is not part of an accessible route.

Anything bigger or taller needs a permit like any other structure. 030(B)(1), with extensions capped at 180 days apiece; an issued permit itself expires if work is not commenced within two years of issuance or not completed within two years after the first required inspection. 020(D).

Violations & Fines

Starting work before a permit issues triggers an investigation fee under § 24.40.030(B)(5) equal to the permit fee that would otherwise have applied, owed whether or not a permit is later granted, and paying it does not legitimize the work. Beyond that fee, permit violations fall under the city's general penalty at § 1.10.010: a misdemeanor punishable by up to $1,000 and 90 days in jail, or a civil infraction of at least $250, with each day of continued violation counted as a separate offense under § 1.10.020.

Frequently Asked Questions

Do I need a permit for a small storage shed in Spokane Valley?
Only if it is not exempt. SVMC § 24.40.040(A)(1) exempts one-story detached sheds and playhouses under 200 square feet from the building permit requirement; anything larger needs a permit and inspection like any other accessory structure.
How long is a Spokane Valley building permit application valid?
An application is valid for one year from filing under § 24.40.030(B)(1). The city can grant one or more extensions of up to 180 days each, but never beyond the time left in the vested code cycle, and extension requests must be in writing.
What happens if I start construction before getting a permit?
You owe an investigation fee equal to the permit fee that would have applied, under § 24.40.030(B)(5), on top of the permit fee itself. Paying it does not make the work legal or guarantee a permit will be issued afterward.
Can a low deck be built without a permit?
Yes, if it meets every condition in § 24.40.040(A)(1)(b): no more than 30 inches above grade, no guardrail required, not over a basement or story, and not part of an accessible route. Taller or code-triggering decks need a permit.

Sources & Official References

Other rules in Spokane Valley

All Spokane Valley rules

Compare Spokane Valley to another location·View the Washington building safety overview

Get notified when Building Permits in Spokane Valley, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.