Upper Darby, PA Building Safety: Building Permits (2026)
Key Facts
- Minimum permit fee
- $179.50 for projects up to $5,000
- Separate permits required
- Building, mechanical, electrical, plumbing, fire, energy
- Per-structure rule
- One permit required per structure on parcel
- Missed-inspection fee
- $100, § 290-3B(1)(i)
- General penalty
- Up to $1,000 per violation, § 262-9
Summary
Upper Darby requires a separate permit for every structure on a parcel, with building, mechanical, electrical, plumbing, fire and energy permits all issued separately. The minimum permit fee is $179.50, scaling up with project value under the Department of Licenses and Inspection's fee schedule.
Building permits. The following fees are established for permits for repairs, alterations, and additions to residential, commercial, and industrial buildings: (1) Minimum permit fee: $179.50. (a) A separate permit is required for each structure located on a parcel. (b) Building, mechanical, electrical, plumbing, fire, and energy permits shall be issued separately. (c) Permit fees shall be calculated based upon the total project value as follows: [1] $5,000 or less: $179.50. [2] $5,001 to $100,000: $20 per $1,000 or fraction thereof.
Full Breakdown
Chapter 262 gives Upper Darby's building permit requirement its legal foundation: § 262-2 adopts the Uniform Construction Code, 34 Pa. Code Chapters 401-405, as the Township's municipal building code, requiring compliance with the International Building, Residential, Fire, Fuel Gas, Mechanical, Plumbing, Energy Conservation and Existing Building Codes for construction work. The actual permit mechanics and fees sit in § 290-3B, the Department of Licenses and Inspections' fee schedule as most recently amended in 2024 by Ordinance No. 3177. That section requires a separate permit for each structure located on a parcel, and specifies that building, mechanical, electrical, plumbing, fire and energy permits must each be issued separately rather than bundled into one.
50, covering any project valued at $5,000 or less. Above that threshold, fees scale with total project value: $20 per $1,000 (or fraction) for projects between $5,001 and $100,000, dropping to $15 per $1,000 for projects up to $5,000,000, and stepping down further at higher value tiers. Minor residential and commercial projects valued at $5,000 or less, covering construction, alteration, repair or replacement of structural, mechanical, gas, electrical or plumbing work, are instead billed a flat $75 per inspection type. 50 Act 45 state fee and a $25 administration fee, and the Department may require a signed contract or similar documentation to verify the project cost an applicant reports.
Violations & Fines
Building code violations fall under Chapter 262's general penalty at § 262-9: a civil fine of up to $1,000 plus the Township's prosecution costs and attorneys' fees for building, housing, property maintenance, health, fire or public-safety code violations, with each day of continued unpermitted work and each violated subsection counted as a separate offense. Missing an inspection with less than 24 hours' notice adds a separate $100 fee under § 290-3B(1)(i).
Frequently Asked Questions
When does Upper Darby require a building permit?
How much does a building permit cost in Upper Darby?
What if my Upper Darby project is under $5,000?
Sources & Official References
Other rules in Upper Darby
Compare Upper Darby to another location·View the Pennsylvania building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.