Vermilion Parish, LA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit required
Floodplain development permit (Sec. 22-8)
Issuing official
Floodplain administrator: parish administrator or designee
Starting fee
$15.00 for improvements up to $2,000.00 (Sec. 22-73)
Application plans
Plans in duplicate, drawn to scale
Appeal board
Parish Police Jury (Sec. 22-46)
Maximum fine
$500.00 per violation, plus up to 30 days in jail
Building code
State uniform construction code adopted (Sec. 8-2)

Summary

In unincorporated Vermilion Parish, Louisiana, construction and other development needs a floodplain development permit from the Police Jury's floodplain administrator, who is the parish administrator or a designee. Applications carry plans in duplicate, lowest-floor elevations and a fee from the Code's schedule, which starts at $15.00. Sec. 8-2 adds the state uniform construction code.

These county ordinances apply to unincorporated areas of Vermilion Parish. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(a)Application for a floodplain development permit shall be presented to the floodplain administrator on forms furnished by him and may include, but not be limited to, plans in duplicate drawn to scale showing the location, dimensions, and elevation of proposed landscape alterations, existing and proposed structures, including the placement of manufactured homes and the location of the foregoing in relation to areas of special flood hazard. Additionally, the following information is required:(1)Elevation (in relation to mean sea level), of the lowest floor (including basement) of all new and substantially improved structures;(2)Elevation in relation to mean sea level to which any nonresidential structure shall be floodproofed; ... (b)Approval or denial of a floodplain development permit by the floodplain administrator shall be based on all of the provisions of this chapter and the following relevant factors:(1)The danger to life and property due to flooding or erosion damage;

Full Breakdown

Sec. 22-8 of the Vermilion Parish Code states that a floodplain development permit is required to ensure conformance with the flood chapter. Sec. 22-1 defines development as any manmade change to improved and unimproved real estate, including buildings or other structures, mining, dredging, filling, grading, paving, excavation, or drilling operations or storage of equipment or materials. A new building in unincorporated Vermilion Parish is therefore development under the Code's own definition, and the Police Jury runs the process through Chapter 22.

Under Sec. 22-45 the applicant files on forms furnished by the floodplain administrator. Plans in duplicate, drawn to scale, show the location, dimensions and elevation of proposed landscape alterations and of existing and proposed structures, including manufactured homes, in relation to areas of special flood hazard. The application also states the lowest-floor elevation of all new and substantially improved structures, the floodproofing elevation for any nonresidential structure, an engineer or architect certificate for a floodproofed nonresidential building, and the extent to which any watercourse or natural drainage will be altered or relocated. Approval or denial rests on nine listed factors, including the danger to life and property from flooding or erosion, the safety of access in times of flood for ordinary and emergency vehicles, and the necessity of a waterfront location.

Sec. 22-73 sets the development permit fee by cost of improvement: $15.00 for $0.00 to $2,000.00, $21.00 for $2,001.00 to $3,000.00, and a printed schedule that reaches $198.00 for $49,001.00 to $50,000.00, followed by $1.50 for each additional $1,000.00.

Two neighboring sections in Chapter 8 matter too. Sec. 8-2 adopts the state uniform construction code, R.S. 40:1730.21 et seq., as now or hereafter amended. Sec. 8-1 requires a separate permit from the building permit department to move any house or building wider than 12 feet on parish roads, with a $10.00 fee and a $2,500.00 bond. Sec. 8-3 adds an airport certification step for any structure taller than 40 feet.

Violations & Fines

Sec. 22-72 bars any structure or land from being constructed, located, extended, converted, or altered without full compliance with Chapter 22 and other applicable regulations. A violation is a misdemeanor, punished under Sec. 1-7 by a fine not exceeding $500.00, imprisonment in the parish jail not exceeding 30 days, or both, with up to 100 hours of community service added or substituted. Each day the violation continues is a new violation, and the violator pays all costs and expenses of the case.

Frequently Asked Questions

Who issues the floodplain development permit in unincorporated Vermilion Parish?
The floodplain administrator, which Sec. 22-43 says is the parish administrator or designee. Sec. 22-44 directs that person to review, approve or deny all development permit applications and to confirm that federal, state or local permits, including section 404 of the Federal Water Pollution Control Act Amendments of 1972, have been obtained. Records are held open for public inspection.
Can a denial or a flood rule be appealed to the Police Jury?
Yes. Under Sec. 22-46 the parish Police Jury serves as the appeal board and hears variance requests and appeals alleging error by the floodplain administrator. A person aggrieved by its decision can go to the courts of competent jurisdiction. No variance is issued in a designated floodway if flood levels would rise during the base flood discharge.
Does the parish write its own building code?
Sec. 8-2 adopts the state uniform construction code promulgated under R.S. title 40, ch. 8, pt. IV-a (R.S. 40:1730.21 et seq.), as now or hereafter amended. In Chapter 8 that one adoption sentence is the parish text, and the parish permit steps that follow it in Chapter 22 are the flood permit and its elevation requirements.
What does moving a building over parish roads require?
Sec. 8-1 prohibits moving a house or building wider than 12 feet on parish roads without a permit. The applicant applies in writing to the building permit department, pays a fee currently set at $10.00, files a bond currently set at $2,500.00, and coordinates utility clearances and sheriff's office escort. The road superintendent inspects the route afterward.

Sources & Official References

Other rules in Vermilion Parish

All Vermilion Parish rules

Compare Vermilion Parish to another location·View the Louisiana building safety overview

Get notified when Building Permits in Vermilion Parish, LA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.