Washington County, MN Building Safety: Building Permits (2026)
Key Facts
- Required before construction
- Certificate of Compliance plus building permit
- Reviewing agency
- County Zoning Administrator
- County response time
- 3 business days after notification
- Septic areas
- On-site waste permit needed before building permit
- Applies to
- Unincorporated county and townships
Summary
Washington County requires a Certificate of Compliance and building permit before any structure is erected, moved onto a lot, or structurally altered in the unincorporated county. Chapter One Section 11.1 of the Development Code puts the County Zoning Administrator in charge of confirming Development Code compliance before the local building official issues a permit.
SECTION 11. OTHER PERMITS 11.1 Building Permits. (1) Structures shall not be erected, moved onto property or structurally altered until a Certificate of Compliance has been issued by the County Zoning Administrator indicating that the existing or proposed structure and the use of the land are in compliance with the Development Code. (2) The local building official shall notify the County prior to the issuance of any building permit for a new structure or expansion in square footage of an existing structure. The County Zoning Administrator shall review the building permit application for compliance with standards contained in the Development Code. Construction details will not be reviewed by the Zoning Administrator. The Zoning Administrator shall provide a response to the local building official regarding the Development Code requirements for said project within three (3) business days of notification.
Full Breakdown
1(2) requires the local building official to notify the county before issuing any building permit for a new structure or for a square-footage expansion of an existing one; the Zoning Administrator reviews the application against Development Code standards, not construction details, and must respond to the local building official within three business days of notification. 1(3) bars site work, including rough grading, driveway construction, footing excavation and tree removal, before a building permit and other required use permits are issued. 2(1) adds that no building permit for a use requiring on-site waste treatment can issue until the Washington County Department of Public Health and Environment has issued an on-site waste disposal permit. This approval chain applies to unincorporated Washington County and its townships; incorporated cities issue their own building permits under their own municipal codes.
Violations & Fines
Proceeding with construction, site work or a structural alteration without the required Certificate of Compliance and building permit is a Development Code violation. Under Chapter One Section 15.1, any violation is a misdemeanor punishable by a fine, imprisonment, or both, plus the cost of prosecution, and the county can order work stopped until the compliance certificate and permit are obtained.
Frequently Asked Questions
Who reviews building permit applications in Washington County?
Can I start grading before I get a permit?
Do I need a separate permit if my lot isn't on public sewer?
Does this permit process apply inside Woodbury or Stillwater?
Sources & Official References
Other rules in Washington County
Compare Washington County to another location·View the Minnesota building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.