Key Facts
- Code adopted
- 2025 CA Electrical Code (2023 NEC base)
- Wiring rule
- Copper required, No. 6 & smaller
- Aluminum wiring
- Building Official approval + inspection
- Permit expires
- 12 months if work not started
- Extension
- Up to 180 days, written request
- Default penalty
- Misdemeanor, up to $1,000/6 months
Summary
Anaheim adopts the 2025 California Electrical Code, based on the 2023 National Electrical Code, as the Anaheim Electrical Code under Municipal Code Section 15.03.010, governing every wiring installation, alteration, repair, and fixture citywide. A permit issued for the work expires if it isn't started within 12 months or is abandoned for 180 days.
The 2025 Edition of the California Electrical Code (which is based on the 2023 National Electrical Code as published by the National Fire Protection Association). The provisions of the California Electrical Code shall apply to the installation of electrical systems, including alterations, repairs, replacement, equipment, appliances, fixtures, fittings and appurtenances thereto. ... Copper wire shall be used for wiring No. 6 and smaller in all installations. Consideration for use of aluminum wiring can be made by the Building Official for feeder lines only on an individual basis where adequate safety measures can be ensured. ... 105.5 Expiration. Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 12 months after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The Building Official is authorized to grant, in writing, one or more extensions of time for periods not more than 180 days each.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-28: Code: Supplement contains: Local legislation current through Ord. 6627, passed 8-11-2026 | Zoning: Local legislation current through Ord. 6627, passed 8-11-2026).
Full Breakdown
020) names the adopted text the "Anaheim Electrical Code," and a copy is kept on file with the Building Division under Health and Safety Code Section 18942(e)(1). 050: copper wire is mandatory for any No. 6 or smaller conductor, and aluminum feeder wiring is allowed only when the Building Official approves it on an individual basis with adequate safety measures, plus continuous inspection by an independent testing agency for the connectors and torque at every termination point. 020's Chapter 1 administrative amendments are substituted into every adopted code, the same permit-expiration clock applies to electrical work: a permit becomes invalid unless work starts within 12 months of issuance or is suspended or abandoned for 180 days, though the Building Official can grant written extensions of up to 180 days at a time for justified cause.
Violations & Fines
Unless the Electrical Code specifies a different penalty, any violation of the Building Standards Codes falls under the citywide default in Section 1.01.370: a misdemeanor punishable by a fine of up to $1,000, up to six months in jail, or both, with each day a violation continues counted as a separate offense.
Frequently Asked Questions
What electrical code does Anaheim use?
How long is an Anaheim electrical permit valid?
Can I use aluminum wiring in Anaheim?
Sources & Official References
Other rules in Anaheim
California rules heatmap·Compare Anaheim to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Electrical Permits in Nearby Cities
How other cities in Orange County handle electrical permits.