Key Facts

Governing code
2025 California Electrical Code (based on 2023 NEC)
Adopting section
Orange Municipal Code § 15.24.010
Copper wire rule
Required for No. 6 wire and smaller
Solar disconnect rule
Lockable AC disconnect within 3 ft of meter
Maximum penalty
$1,000 fine and/or 6 months jail per day

Summary

Orange requires an electrical permit for equipment construction, alteration, repair, or conversion work under the 2025 California Electrical Code, based on the 2023 National Electrical Code, adopted by City Code Section 15.24.010. Local amendments require copper wire on smaller circuits and a lockable AC disconnect near the meter for solar systems. Unpermitted electrical work draws fines up to $1,000 per day and up to six months in jail under Section 15.24.030.

For the purpose of prescribing regulations for electrical equipment construction, alteration, repair, improving, conversion and demolition, the following construction code, subject to the modifications set forth in this chapter, is hereby adopted: the California Electrical Code, 2025 Edition, based on the 2023 National Electrical Code as published by the National Fire Protection Association... 310.3(B) Conductor Material is revised to add a second paragraph to read as follows: Copper wire shall be used for wiring No. 6 and smaller in all installations. Consideration for use of aluminum wiring can be made by the Building Official for feeder lines only on an individual basis where adequate safety measures can be ensured.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4796775; v10 updated 2026-01-27).

Full Breakdown

010 adopts the California Electrical Code, 2025 Edition, based on the 2023 National Electrical Code as published by the National Fire Protection Association, as the electrical regulations governing equipment construction, alteration, repair, improving, conversion, and demolition citywide. 020 and are administered through the Community Development Department's Building and Safety Services Division alongside building, plumbing, and mechanical permits. 025 amends two specific NEC provisions for local conditions. 3(B), Conductor Material, to require copper wire for wiring No. 6 and smaller on all installations, while allowing the building official to approve aluminum wiring for feeder lines only on an individual, case-by-case basis where adequate safety measures can be ensured.

13(A), Location, to require that the disconnect for a photovoltaic and electrical energy storage system be installed at a readily accessible exterior location, with a visible-open, lockable AC disconnect located within three feet of the meter, the photovoltaic disconnect, or wherever else the Building or Fire Code Official requires. These amendments apply on top of the base NEC permit and inspection requirements for any new wiring, service upgrade, panel change, or solar installation.

Violations & Fines

Section 15.24.030 makes any violation of the electrical code chapter a separate offense for each day it continues, punishable by a fine of not more than $1,000, imprisonment for not more than six months, or both. The city may also enforce the chapter through injunction or other civil remedy rather than, or in addition to, criminal prosecution, giving Building and Safety inspectors a route to halt unpermitted electrical work directly.

Frequently Asked Questions

Do I need a permit for a new circuit or panel upgrade in Orange?
Yes. Section 15.24.010 adopts the 2025 California Electrical Code for all electrical equipment construction, alteration, repair, and conversion work, and permits are required under that code's base provisions. Fees are set by City Council resolution under Section 15.24.020 and are processed by the Community Development Department alongside plan check for the related building work.
Can I use aluminum wiring in my Orange home?
Not for wiring No. 6 gauge or smaller. Section 15.24.025 requires copper wire for those smaller conductors in every installation. The building official may approve aluminum wiring, but only for feeder lines, only on an individual case-by-case basis, and only where adequate safety measures can be ensured.
Where does my solar disconnect switch need to go?
Section 15.24.025 amends NEC Section 690.13(A) to require a visible-open, lockable AC disconnect for any photovoltaic or electrical energy storage system, installed at a readily accessible exterior location and positioned within three feet of the meter, the photovoltaic disconnect, or another location the Building or Fire Code Official designates.

Sources & Official References

Other rules in Orange

All Orange rules

California rules heatmap·Compare Orange to another location·View the California building safety overview

Get notified when Electrical Permits in Orange, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Nearby Cities

How other cities in Orange County handle electrical permits.

Santa Ana, CA
Some Restrictions
Irvine, CA
Some Restrictions
Mission Viejo, CA
Some Restrictions
Fullerton, CA
Some Restrictions
Huntington Beach, CA
Some Restrictions
Newport Beach, CA
Some Restrictions
Anaheim, CA
Some Restrictions
Costa Mesa, CA
Some Restrictions