Charleston, SC Building Safety: Electrical Permits (2026)
Key Facts
- Governing code
- SC Residential/Building Code, latest ICC edition
- Electrical standard
- National Electrical Code (NFPA)
- Enforcing office
- Building Inspections Division
- Plans required before work
- Sec. 7-7 submission to chief building official
- Reconnection after 1-year outage
- New permit and inspection required (Sec. 7-46)
- General penalty
- Up to $500 fine or 30 days jail
Summary
Charleston enforces the South Carolina Residential Code and Building Code, which folds in the National Electrical Code for every electrical system in the city. All wiring, fixtures and equipment installed in new construction, alterations or repairs must conform, and the Building Inspections Division reviews and permits the work under City Code Sec. 7-26.
The latest edition of the South Carolina Residential Code and Building Code, as adopted by the state and published by the International Code Council, Inc., is hereby adopted so that hereafter all building construction, reconstruction, alteration and repairs; including all building materials, electrical systems, gas systems, mechanical systems, plumbing systems and appliances used in connection with building shall conform thereto.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 114 | Zoning: Supplement 25).
Full Breakdown
Under City Code Sec. " The state building code in turn incorporates the National Electrical Code published by the National Fire Protection Association, one of the recognized codes the South Carolina Building Codes Council adopts and amends, as the city's own fire district provisions cross-reference at Sec. 7-1. Sec. C. Code § 6-9-60, the International Existing Building Code and International Swimming Pool and Spa Code as permissive codes that can trigger additional electrical work on pools and older structures. Sec. 1. Before wiring work begins, an owner, architect or builder must notify the chief building official and submit plans under Sec.
7-7. The chief building official, who also serves as public safety and housing officer, has jurisdiction to enforce all building laws citywide under Secs. 7-3 and 7-6, and personally inspects or causes inspection of buildings under Sec. 7-5. Sec. 7-46 separately requires a city permit and inspection of the electrical system before service can be reestablished after an interruption of more than one year.
Violations & Fines
Working without a permit or against a rejected plan is a Code violation. Because no separate electrical penalty is set, Sec. 1-16 applies the Code's general penalty: a fine up to $500.00, up to 30 days in jail, or both, with each day a violation continues counted as a separate offense. The chief building official and Building Inspections Division enforce compliance and can order corrections before occupancy or reconnection.
Frequently Asked Questions
Does Charleston use its own electrical code or the state code?
Who reviews electrical permits in Charleston?
Do I need a new permit if my building's power was off for a year?
Sources & Official References
Other rules in Charleston
Compare Charleston to another location·View the South Carolina building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Electrical Permits in Nearby Cities
How other cities in Charleston County handle electrical permits.