Clarksville, TN Building Safety: Electrical Permits (2026)
Key Facts
- Code adopted
- 2017 NEC (NFPA 70)
- Permit required
- before any wiring change
- Fee, 0-200 amp
- $32.00
- Permit expires
- 180 days from issue
- Owner permit limit
- one per 12 months
- Violation fine
- $50.00 per day
Summary
Clarksville has adopted the 2017 National Electric Code (NFPA 70) by reference for all electrical work in the city. Section 4-304.5 requires a permit before any wiring change, and Section 4-306 sets inspection fees from $32.00 for a 200-amp service up to $90.00 for 401 to 1,000 amps.
Sec. 4-301. - Adopted. (a) Pursuant to the authority granted by T.C.A. § 6-54-501 et seq., the 2017 edition of the National Electric Code, as prepared by the National Fire Protection Association, NFPA 70, together with all revisions associated therewith and forthcoming, including all appendices thereto, are hereby adopted by reference. (b) Three (3) copies of the code shall be filed in the office of the building official.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 110 Update 2 | Zoning Ordinance: Supplement 6).
Full Breakdown
Section 4-301 adopts, under T.C.A. § 6-54-501 et seq., the 2017 edition of the National Electric Code as prepared by the National Fire Protection Association (NFPA 70), with all future revisions and appendices, and requires three copies filed with the building official. Section 4-304.5 requires an electrical permit, and a building permit if needed, before any wiring is altered, changed, or installed in a building or premises for lights, motors, signs or devices. Section 4-303 requires the contractor to hold a license under T.C.A. Title 62, Chapter 6, or Title 69, Chapter 10, and Section 4-304 requires an electrician's certificate backed by at least $100,000.00 in liability insurance, issued for an annual $50.00 fee expiring each September 30.
A property owner may pull a permit to wire their own residence under Section 4-305(2), limited to the applicant and immediate family, capped at one such permit per 12 months absent an emergency like fire or wind damage. Every electrical permit expires 180 days from issuance under Section 4-305(4), extendable once. Section 4-306 sets inspection fees by amperage: $32.00 for 0 to 200 amps, $45.00 for 201 to 400 amps, $90.00 for 401 to 1,000 amps, plus $32.00 flat fees for HVAC, temporary service, service release, change of service, pools and hot tubs, underground inspection and signs, a $50.00 safety inspection, and a $10.00 per-permit administration fee.
Section 4-307 requires a rough-in and a final inspection on wiring installed in any structure. Violation penalties under Section 4-313 mirror the building code: a $50.00 civil fine per day of continued violation after notice, plus authority to issue stop-work orders and terminate power for an immediate danger to health or safety.
Violations & Fines
Section 4-313 subjects anyone who violates the electrical code, works contrary to approved plans or a code official's directive, or continues work after a stop-work order, to a civil fine of $50.00, with each day the violation continues after notice counted as a separate offense. The building official may also terminate electrical power to a structure presenting an immediate danger to health, safety or welfare.
Frequently Asked Questions
What electrical code does Clarksville use?
Can a homeowner pull their own electrical permit?
How much does an electrical inspection cost in Clarksville?
How long is an electrical permit good for?
Sources & Official References
Other rules in Clarksville
Compare Clarksville to another location·View the Tennessee building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.