Cranston, RI Building Safety: Electrical Permits (2026)
Key Facts
- Adopted code
- 1975 National Electrical Code (NFPA)
- Permit required
- written permit before any electrical work
- Issuing authority
- inspector of electrical installations
- Permit fees
- same schedule as building permits
- Temporary permit fee
- $5.00 for circus, carnival, used-car-lot work
Summary
Cranston requires a written permit from the inspector of electrical installations before any electrical work under the 1975 National Electrical Code, adopted by ordinance and kept on file with the city clerk.
The 1975 edition of the National Electrical Code by the National Fire Protection Association, a copy of which is on file in the office of the city clerk, and which is incorporated herein and made a part hereof by reference thereto with the exception of Section 90-10, "Revisions," is adopted, ratified and confirmed. (Prior code § 8-1) § 15.08.020. Electrical permits. No electrical installation in buildings and other structures shall be constructed, repaired, maintained or installed without a written or printed permit issued by the inspector of electrical installations. The inspector may require that each application for a permit shall be accompanied by such plans and specifications as the inspector may determine. The inspector may revoke any permit should he or she become convinced that the work is being done under such permit in violation of law, or in a reckless or careless manner or has been obtained through misrepresentation. The following schedule of fees shall be charged for the issuance of electrical permits for the installation or repair of all types of electrical installation. Such schedule of fees for permits shall be based on the cost of electrical equipment, materials and labor used for the installation or repair of any electrical project. Schedule of Permit Fees Use same schedule of fees as for building permits in Section 15.04.020.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4824304; v14 updated 2026-05-18).
Full Breakdown
Cranston has adopted the 1975 edition of the National Electrical Code by reference, with a copy on file at the office of the city clerk, per Code of Ordinances § 15.08.010. Under § 15.08.020, no electrical installation, repair, or maintenance may be constructed or performed in any building or structure without a written permit issued by the inspector of electrical installations. The inspector may require plans and specifications, and may revoke a permit for work done in violation of law, carelessly, or obtained through misrepresentation. Permit fees follow the same schedule as building permits under § 15.04.020; temporary permits for circuses, carnivals, and used car lots cost $5.00 each.
Violations & Fines
Violating the electrical code carries the citywide general penalty: a fine up to $200.00, imprisonment up to 30 days, or both, since Chapter 15.08 sets no violation-specific penalty (§ 1.08.010).
Frequently Asked Questions
Do I need a permit for electrical work in Cranston?
What electrical code does Cranston enforce?
Sources & Official References
Other rules in Cranston
Compare Cranston to another location·View the Rhode Island building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Electrical Permits in Nearby Cities
How other cities in this county handle electrical permits.