Darlington County, SC Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Electrical code
NEC 2002 Edition (Sec. 8-36)
Permit required
Sec. 8-77, before any electrical work
Base permit fee
$80 to $18,327+ (Appendix A)
Admin fee
$20 flat per permit
No-permit penalty
Fee doubled under Sec. 8-84
Violation
Misdemeanor, S.C. Code § 6-9-80
Effective date
July 1, 2001

Summary

Darlington County adopted the 2002 National Electrical Code by reference under Sec. 8-36 for all wiring, service and equipment work in unincorporated Darlington County. Sec. 8-77 requires a separate permit from the building codes enforcement officer before installing any electrical equipment or apparatus, with a narrow exemption only for agricultural storage structures costing $5,000 or less needing no inspection.

These county ordinances apply to unincorporated areas of Darlington County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Sec. 8-36. - Electrical code. The National Electrical Code, 2002 Edition, as published by the National Fire Protection Association, is hereby adopted by reference and shall be known and cited as the "Electrical Code." ... ... Sec. 8-77. - Permit required. No person shall construct, enlarge, alter, repair, move, improve, remove, convert, or demolish any building, structure, or service system, or install any electrical, gas, or plumbing equipment or other apparatus regulated by this chapter without first obtaining from the building codes enforcement officer a separate permit for each such building, structure, system, or installation in the manner prescribed in the codes adopted above; provided, however, that no such permit be required for any agricultural storage structure construction or repair costing $5,000.00 or less and for which no inspection is required pursuant to the codes adopted above.

Full Breakdown

In unincorporated Darlington County, Sec. 8-36 of the county code adopts the National Electrical Code, 2002 Edition, published by the National Fire Protection Association, and directs that it be cited as the 'Electrical Code.' Sec. 8-77 makes it unlawful to install any electrical equipment or other apparatus regulated by chapter 8 without first obtaining a separate permit from the building codes enforcement officer, issued under the procedures the adopted codes prescribe. The only carve-out is for agricultural storage structure work costing $5,000 or less that needs no inspection under the adopted codes.

Under Appendix A's permit fee schedule, an electrical permit carries the same base fee scale as building, mechanical, plumbing and gas work, from $80.00 for jobs up to $2,000.00 up to $18,327.00 plus $2.00 per additional thousand for work over $5,000,000.00, on top of a flat $20.00 administrative fee, plus a $25.00 electrical reconnect fee unless the reconnection stays active 30 days or less for a special event. Skipping the permit does not avoid the fee: Sec. 8-84 doubles the required permit fee for anyone who fails to comply with Sec.

8-77. Sec. 8-85 makes violating the technical provisions of the adopted electrical code a misdemeanor punishable under S.C. Code 1976 § 6-9-80, and an ignored correction notice or stop-work order draws a uniform ordinance summons. The codes took effect July 1, 2001, and apply only to unincorporated areas of the county, excluding land owned by the state or federal government.

Violations & Fines

Working without the required electrical permit doubles the permit fee under Sec. 8-84 and exposes the property owner or contractor to a misdemeanor charge under Sec. 8-85, punishable per S.C. Code 1976 § 6-9-80. Ignoring a written correction notice or a stop-work order draws a uniform ordinance summons. The building codes enforcement officer may also revoke a permit issued on a false statement, with no refund of the fee paid.

Frequently Asked Questions

Does Darlington County require a permit for electrical work in the unincorporated area?
Yes. Sec. 8-77 of the county code requires a separate permit from the building codes enforcement officer before installing any electrical equipment or apparatus regulated by chapter 8, issued under the procedures set out in the adopted National Electrical Code. The only exception covers agricultural storage structure work costing $5,000.00 or less that needs no inspection.
What electrical code edition does Darlington County enforce?
Sec. 8-36 adopts the National Electrical Code, 2002 Edition, published by the National Fire Protection Association, by reference, and directs that it be cited as the county's 'Electrical Code.' Sec. 8-39 provides for automatic updates on a three-year cycle set by the South Carolina Building Codes Council.
What happens if I do electrical work without a permit in Darlington County?
Sec. 8-84 doubles the permit fee owed for failing to comply with Sec. 8-77's permit requirement, and Sec. 8-85 makes violating the adopted electrical code a misdemeanor punishable under S.C. Code 1976 § 6-9-80. Sec. 8-79 also lets the building codes enforcement officer revoke a permit obtained through a false statement, without refunding the fee.

Sources & Official References

Other rules in Darlington County

All Darlington County rules

Compare Darlington County to another location·View the South Carolina building safety overview

Get notified when Electrical Permits in Darlington County, SC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.