Key Facts
- Permit required for
- Installation, extension, alteration or repair of wiring
- Issuing official
- City electrical inspector
- Code adopted
- National Electrical Code, 1984 edition
- Permit expires
- 6 months if work not started
- First penalty
- $50.00 civil fine
- Appeal window
- 30 days to city hearing officer
Summary
High Point requires a written permit from the city electrical inspector before anyone installs, extends, alters or repairs electrical wiring, devices, appliances or equipment. The rule covers the city and the Guilford County portion of its extraterritorial area under the National Electrical Code, 1984 edition. Skipping the permit draws escalating civil penalties under the city's general enforcement section.
Sec. 9-2-41. - Permits required.(a)Building permit. No person shall commence or proceed with the construction, reconstruction, alteration, repair, removal or demolition of any building or other structure, or any part thereof, without a written permit therefor from the director of planning and development.(b)Plumbing permit. No person shall commence or proceed with the installation, a extension or general repair of any plumbing system without a written permit from the plumbing inspector.(c)Heating-air conditioning permit. No person shall commence or proceed with the installation, extension, alteration or general repair of any heating or cooling equipment system without a written permit from the heating-air conditioning inspector.(d)Electrical permit. No person shall commence or proceed with the installation, extension, alteration or general repair of any electrical wiring, devices, appliances or equipment without a written permit from the electrical inspector.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 9 | Development Ordinance: Supplement 14).
Full Breakdown
High Point Code of Ordinances § 9-2-41 sets four permit categories the inspections division administers: building, plumbing, heating-air conditioning and electrical. Subsection (d) singles out electrical work: no person may commence or proceed with the installation, extension, alteration or general repair of any electrical wiring, devices, appliances or equipment without a written permit from the electrical inspector. That obligation sits inside the City of High Point and Environs Electrical Code adopted at § 9-2-6, which incorporates the National Electrical Code, 1984 edition, as adopted in North Carolina State Building Code Volume IV, for the city and the Guilford County portion of its extraterritorial jurisdiction.
Section 9-2-6 layers five local-option rules onto the national code: metal raceway or metal-jacketed cable in the primary fire district, protected raceway for required emergency power systems, individual rigid conduit for fuel-dispenser wiring, a ban on service equipment inside attics, closets, kitchen cabinets, bathrooms or trash bins, and spare-capacity raceway in flush panelboards. Applications go to the inspections division of the planning and development department under § 9-2-42, naming the owner, any agent, and the licensed contractor. The inspector issues the permit only when satisfied the work complies with the electrical code and this chapter, per § 9-2-43.
A permit lapses automatically six months after issuance if the work hasn't started, or immediately if work stops for 12 straight months, under § 9-2-45, and § 9-2-44 lets the inspector revoke a permit in writing for a material departure from the approved plans, refusal to follow orders, noncompliance with the code, or a false statement made to obtain it.
Violations & Fines
Working without the required electrical permit is a Code violation. Under the city's general enforcement section 1-1-4, unless a section specifically labels a violation a misdemeanor, it draws an escalating civil penalty: $50.00 for a first violation, $100.00 for a second, $200.00 for a third, and $500.00 for the fourth and each violation after that. A cited person may appeal in writing to the city within 30 days, with review by a hearing officer and further review by the superior court under G.S. 160D-1402.
Frequently Asked Questions
Do I need a permit to replace a light fixture or outlet in High Point?
How long is a High Point electrical permit valid?
Can the city revoke an electrical permit already issued?
Sources & Official References
Other rules in High Point
Compare High Point to another location·View the North Carolina building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Electrical Permits in Nearby Cities
How other cities in this county handle electrical permits.