Mission, TX Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit required
Before any wiring installation or alteration
Issued by
City electrical inspector
Adopted code
2002 National Electrical Code
Minimum fee
$5.00 per permit issuance
Work deadline
Completed within 365 days of issuance

Summary

Any electrical wiring, alteration, or equipment addition in Mission requires a permit from the city electrical inspector before work starts, pulled by a licensed master electrician under the 2002 National Electrical Code adopted by Sec. 18-211.

Before proceeding with the installation, alteration of or the addition to any electrical wiring or equipment within or on any building, structure or premises, publicly or privately owned in the city, the master electrician in charge of such proposed work shall first file with the city electrical inspector an application requesting the inspection and secure a permit therefor.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 31).

Full Breakdown

Mission requires a permit before any electrical wiring, alteration, or equipment addition on a building or premises: the master electrician files an application with the city electrical inspector and secures the permit first (Sec. 18-181). Fees run from $5 for issuance up to per-outlet and per-fixture charges (Sec. 18-185), and permits expire if work isn't started within 30 days or finished within 365 days (Sec. 18-186). Rough-in and final inspections are mandatory, and wiring cannot be concealed until approved. The city has adopted the 2002 National Electrical Code as its governing standard, effective January 1, 2003 (Sec. 18-211).

Violations & Fines

Working without a permit or concealing wiring before inspection violates Chapter 18 and Mission's general Code penalty (Sec. 1-14), punishable by a fine up to $2,000 for safety-code violations, with each day a separate offense.

Frequently Asked Questions

Do I need a permit to replace a light fixture in Mission?
No. Sec. 18-182 exempts replacing electrical fixtures or appliances that require no change to the existing wiring from the permit requirement.
What electrical code does Mission enforce?
The city adopted the 2002 National Electrical Code in its entirety, minus fee provisions, effective January 1, 2003, under Sec. 18-211.
Who can pull an electrical permit in Mission?
Only a master electrician licensed and bonded in the city may file the application and secure the permit under Sec. 18-181.

Sources & Official References

Other rules in Mission

All Mission rules

Texas rules heatmap·Compare Mission to another location·View the Texas building safety overview

Get notified when Electrical Permits in Mission, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Nearby Cities

How other cities in Hidalgo County handle electrical permits.

Edinburg, TX
Some Restrictions
Pharr, TX
Some Restrictions