Queen Anne's County, MD Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Permit deadline
Within 10 business days when no building permit is required
Code standard
National Electrical Code, current edition (§ 11-19)
Adopted edition
2017 NEC, NFPA 70, listed in § 10-1 E
Fine
Not less than $25, not exceeding $1,000
Imprisonment
Not exceeding 90 days
Termination letter
Registered letter to permit office within seven days

Summary

In unincorporated Queen Anne's County, Maryland, § 11-17 requires that when a building permit is not required, any modification of circuitry requiring an electrical permit be secured within 10 business days of commencement of work. Work by anyone other than a licensed electrician must be directed and supervised by a licensed master or restricted electrician, and all work must meet the current National Electrical Code.

These county ordinances apply to unincorporated areas of Queen Anne's County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Nothing in this chapter shall be construed to prevent any person from doing or performing any of the kinds of work enumerated in this chapter if: A. The work is performed under the direction and supervision of a duly licensed master or restricted electrician; and B. The licensed electrician is responsible for all the work done under the electrician's direction and supervision. C. When a building permit is not required, any modification of circuitry requiring an electrical permit shall be secured within 10 business days of commencement of work.

Full Breakdown

Electrical work in unincorporated Queen Anne's County, including Kent Island, runs on three layers: a County license, a permit and an inspection standard. Section 11-17 sits in Chapter 11 (Electrical Examiners) and does two jobs. First, it protects work done by someone other than a licensed electrician, as long as the work is performed under the direction and supervision of a duly licensed master or restricted electrician who remains responsible for all of it. Second, subsection C sets a deadline for the case where no building permit applies: any modification of circuitry requiring an electrical permit must be secured within 10 business days of commencement of work. That subsection was added 2-14-2017 by Ord. No. 16-23.

The code standard is the National Electrical Code. Section 11-19 requires all work installed under the chapter to follow the National Electrical Code, current edition. Section 10-1 E, amended 9-28-2021 by Ord. No. 21-08, lists the current 2017 National Electrical Code, NFPA 70, among the adopted codes. Section 10-4 exempts smoke detectors from any requirement to be wired into an arc fault circuit interrupter, specifically including Section 210.12(B).

Farm buildings escape the Building Code but not electrical permits: Section 101.2 and the farm building exemption in Section 105.2 both say the owner must still obtain required electrical permits. During construction, Section 108.3 authorizes the Building Official to permit power to be temporarily supplied and used in part of an electrical installation before it is fully completed and the final certification of completion has been issued.

Hookups carry their own gate. Under § 11-20 an electric company cannot attach its power lines or an electric meter to a consumer's property unless the work was installed by a master electrician licensed under the chapter, and not until a temporary or permanent meter cut-in certificate has been issued by an inspection agency or a department designated by the County Commissioners. The certificate is issued in duplicate and sent to the power company. The Board can issue a special permit to a contractor needing electricity during construction.

If the licensed electrician on a permitted job is terminated, § 11-23 requires a registered letter to the permit office within seven days, a job inspection with all inspectors present, and a new permit filed by the replacement electrician before starting any work.

Violations & Fines

Practicing as a master or restricted electrician without complying with Chapter 11, or doing electrical work other than under a licensed electrician's direction, is a misdemeanor under § 11-21. Under § 11-22 a conviction carries a fine of not less than $25 but not exceeding $1,000, or imprisonment not exceeding 90 days, or both, and automatically annuls the person's license. Skipping the termination steps in § 11-23 carries the same penalties and can bring a stop-work order under Section 115 of the International Building Code.

Frequently Asked Questions

How long do I have to get an electrical permit in Queen Anne's County?
Section 11-17C says that when a building permit is not required, any modification of circuitry requiring an electrical permit shall be secured within 10 business days of commencement of work. Where a building permit is required, the electrical work goes through that permit process, so ask the Department of Planning and Zoning how it is handled on your project.
Which National Electrical Code applies in unincorporated Queen Anne's County?
Section 11-19 requires all work installed under Chapter 11 to follow the National Electrical Code, current edition. Section 10-1 E, as amended 9-28-2021, lists the current 2017 National Electrical Code, NFPA 70. Section 10-4 adds an amendment exempting smoke detectors from arc fault circuit interrupter wiring requirements, including Section 210.12(B).
Does a farm building need an electrical permit?
Yes. The County exempts farm buildings from the Building Code in Section 101.2 and from the building permit list in Section 105.2, but both provisions state the exemption does not relieve the owner from obtaining required electrical or plumbing permits. The owner must also comply with all other applicable local, state and federal laws.
When can the power company connect my new service?
Under § 11-20, the electric company cannot attach its power lines or meter unless a master electrician licensed under Chapter 11 installed the work, and not until a temporary or permanent meter cut-in certificate is issued by an inspection agency or a department the County Commissioners designate. The Board can issue a special permit to a contractor needing electricity during construction.

Sources & Official References

Other rules in Queen Anne's County

All Queen Anne's County rules

Compare Queen Anne's County to another location·View the Maryland building safety overview

Get notified when Electrical Permits in Queen Anne's County, MD changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.