Key Facts

Adopted code
Indiana Electrical Code 1987 (IEC, eff. 3-1-1987)
Permit issued by
County Planning and Building Department
Electrical fee
$.20 per amp per meter, $20 minimum
New branch circuit fee
Flat fee under § 151.043
Permit validity
Two years from issuance
Violation fine
$500 to $2,500 under § 151.999(C)(4)

Summary

Every electrical job on a building or structure in unincorporated Lake County needs a building permit before work starts, built on the 1987 Indiana Electrical Code the county adopted by reference in § 151.004(A)(4). The County Planning and Building Department charges $.20 per amp per meter, and violators face a $500-$2,500 fine.

These county ordinances apply to unincorporated areas of Lake County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(A) A permit shall be obtained before beginning construction, alteration, repair, or maintenance of any building or structure in the unincorporated areas of the county or cause the same to be done without first obtaining a separate permit for each such building or structure from the County Planning and Building Department. ...

(A) The following rules, regulations, and codes are hereby adopted by reference as the rules and regulations governing the construction and alterations of buildings and structures in the unincorporated areas of the county, and shall include late amendments to these articles as the same are published in the Indiana Register or in the Indiana Administrative Code with effective dates as fixed therein:

(4) Indiana Electrical Code 1987 (IEC, 3-1-1987); ... Electrical Per meter $.20 per amp $20

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-14: Supplement contains: Local legislation current through 6-9-2026; and State legislation current through Indiana Legislative Service, 2025 Acts, Pamphlet No. 3).

Full Breakdown

Lake County adopted the Indiana Electrical Code (IEC, effective 3-1-1987) by reference in § 151.004(A)(4), along with any later amendments published in the Indiana Register or Indiana Administrative Code. Section 151.020(A) requires a permit before beginning any construction, alteration, repair or maintenance of a building or structure in the unincorporated county, obtained from the County Planning and Building Department, which covers electrical work performed as part of that construction. Section 151.021 requires the application to include a plat or sketch, plans and specifications, and any information the Department requests, submitted as a sworn affidavit.

The fee schedule in § 151.043 sets electrical charges separately from the base building fee: $.20 per amp per meter with a $20 minimum, plus a flat fee for a new branch circuit. Section 151.025(A) requires rough electric and electric service inspections, plus a final electric inspection, among the minimum inspections scheduled for every permit; an inspection that finds work out of compliance draws an additional $50 fee under § 151.025(B), and a re-inspection after correction costs another $50 under § 151.025(C). A permit is valid two years from issuance under § 151.023(B), and § 151.026 lets a permit-holder appeal a Building Department decision to the County Board of Zoning Appeals and then to the Indiana Fire Prevention and Building Safety Commission under I.C. 22-12-7-11 or 22-12-7-12.

Violations & Fines

Section 151.999(C)(4) sets a fine of $500 to $2,500 specifically for electric permit and swimming pool violations, on top of the general building-code and permit-violation fines of $500 to $2,500 and the $750-$2,500 stop-work-order fine the same section sets for the chapter as a whole.

Frequently Asked Questions

What electrical code applies to unincorporated Lake County?
The county adopted the Indiana Electrical Code, effective March 1, 1987, by reference in § 151.004(A)(4), along with later amendments published in the Indiana Register or Indiana Administrative Code. Any electrical work done as part of construction, alteration or repair of a building or structure must meet that code.
Do I need a separate electrical permit or is it part of the building permit?
Lake County issues one building permit under § 151.020 for construction, alteration, repair or maintenance of a structure, and electrical work performed under that permit is billed through the separate electrical line in the § 151.043 fee schedule: $.20 per amp per meter with a $20 minimum.
What inspections does electrical work need?
Section 151.025(A) schedules a rough electric inspection, an electric service inspection, and a final electric inspection among the minimum inspections required for every permit. Work found out of compliance draws an added $50 fee, and a re-inspection after the fix costs another $50 under § 151.025(B) and (C).

Sources & Official References

Other rules in Lake County

All Lake County rules

Compare Lake County to another location·View the Indiana building safety overview

Get notified when Electrical Permits in Lake County, IN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.