Skip to main content
CityRuleLookup

St. Louis, MO Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
2017 National Electrical Code
Enforcing agency
Chief Electrical Inspector
Homeowner permits
Allowed after one-time written test
Application fee
$25, plus per-unit inspection fees
Lead time
File at least 24 hours ahead

Summary

St. Louis has adopted the 2017 National Electrical Code and requires a permit before any electrical work begins, issued by the code official within the Division of Building and Inspection to a licensed electrician, contractor, or qualifying homeowner.

No person shall commence any electrical work until a permit for such work has been issued by the code official. An electrical permit is not required for minor repairs as defined in Section 80.3.1. The fees for said permits shall be paid to the City of Saint Louis for each permit herein required. All work shall be done by a certified employee, firm, corporation, limited liability company, or other business entity, institution, or organization who holds an electrical license in whose name the permit or permits required by this section and Section 80.21.3 are issued.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 11).

Full Breakdown

The City of Saint Louis adopted the 2017 National Electrical Code as its Electrical Code under § 25.02.010, and § 25.02.020's Annex H amendments require a permit before any electrical work begins. Applications go to the code official, the Building Commissioner or Chief Electrical Inspector, and work must be done by a licensed electrical contractor. Minor repairs, like swapping fuses or breakers up to 60 amps, are exempt. An owner-occupant of a single-family dwelling may pull a permit after passing a one-time written test, but must personally buy the materials and do the labor. Applications must be filed at least 24 hours before work starts, and the application fee is $25.

Violations & Fines

Working without a permit, or letting a non-employee of the licensed contractor do the work, can trigger disconnection of electric service and penalties under § 80.15.4.

Frequently Asked Questions

Can a homeowner pull their own electrical permit in St. Louis?
Yes: an owner-occupant of a single-family dwelling can apply after passing a free one-time written test, but must personally buy the materials and perform all the labor themselves.
What electrical work doesn't need a permit in St. Louis?
Minor repairs are exempt, including replacing lamps, fuses, or breakers rated up to 60 amps, and swapping light switches, sockets, or a single fixture on an existing outlet.
Who enforces the St. Louis Electrical Code?
The Chief Electrical Inspector, within the Division of Building and Inspection's Section of Electrical Regulation and Inspection, issues permits and conducts required inspections.

Sources & Official References

Other rules in St. Louis

All St. Louis rules

Compare St. Louis to another location·View the Missouri building safety overview

Get notified when Electrical Permits in St. Louis, MO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.