Tallahassee, FL Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Enforcing agency
Electrical inspection division & electric department
Plan submittal exempt
Single-family detached & duplex dwellings
Meter numeral size
Minimum 1 inch, contrasting color
Power disconnection notice
48 hours' written notice
Governing section
LDC § 3-181

Summary

Tallahassee requires a complete set of electrical plans before most jobs start, reviewed by the electrical inspection and electric departments. Single-family detached and duplex dwellings are exempt from the plan-submission step, but every job still needs an approved permit before work begins.

All electrical installations shall conform to the following provisions: (1)A complete set of electrical plans shall be submitted to electrical inspection and electric departments for approval before work is started, except on single-family detached and duplex dwellings. Such plans to indicate location of service and whether overhead or underground, and a diagram showing feeder details shall be provided prior to the installation of the feeders. Such diagram shall show the area in square feet of the building or other structure supplied by each feeder, the total connected load before applying demand factors, the demand factors used, the computed load after applying demand factors and the size and type of conductors to be used. No electrical permit shall be issued until all corrections have been approved. Any work affecting the electrical service location, size, or size increase must be approved prior to permitting by the electric department.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Land Development Code: Supplement 75 | Code of Ordinances: Supplement 75).

Full Breakdown

LDC § 3-181 sets out the city's special electrical installation requirements. Before work starts on most projects, a complete set of electrical plans must go to both the electrical inspection division and the electric department for approval; the plans must show the service location, whether it is overhead or underground, and a feeder diagram giving the square footage served, the connected load, demand factors, and the size and type of conductors. Single-family detached and duplex dwellings are exempted from this plan-submission requirement, though a permit is still needed.

No electrical permit will issue until every plan correction the reviewers flag has been resolved, and any change to the electrical service's location or size must be approved before the city will permit the work. Before a service entrance goes into any building, the customer, builder, or contractor must get the electric department's approval of the point of service connection, and before permanent connection, the building or house number must be permanently mounted on the meter can in numerals at least one inch tall in a color that contrasts with the can.

Permanent electrical service cannot be connected until all fees, charges, and assessments due before a certificate of occupancy are paid, and until that certificate issues, the building official may, on 48 hours' written notice to the contractor and owner, order the power disconnected for cause. Connections from the city's electric lines are made by the city itself at the scheduled fee, provided overhead wire is used; underground conduit connections are made at the consumer's expense.

Violations & Fines

Skipping the required plan submittal or starting work before the city approves service location or size changes can hold up or void the permit; § 3-178 lets the building official suspend or revoke any permit issued on incomplete or incorrect information. Connecting permanent power before the certificate of occupancy issues risks disconnection on 48 hours' notice, with all reconnection fees charged to the contractor. General violations of the LDC carry a fine up to $500 and up to 60 days in jail under § 1-7.

Frequently Asked Questions

Do I need to submit electrical plans for a house wiring job?
Not if it's a single-family detached or duplex dwelling: LDC § 3-181(1) exempts those from the plan-submission step. Every other project needs a complete plan set, including a feeder diagram, submitted to the electrical inspection and electric departments before work starts.
Can the city cut my power before I get a certificate of occupancy?
Yes. Under LDC § 3-181(4), until the certificate of occupancy issues, the building official may order permanent power disconnected on 48 hours' written notice to the contractor and owner, with reconnection fees billed to the contractor.
Who approves where my new electric service connects?
The city electric department must approve the point of service entrance before it is installed, per LDC § 3-181(1)a. Any later change to the service's location or size also needs department approval before the city will permit the work.

Sources & Official References

Other rules in Tallahassee

All Tallahassee rules

Florida rules heatmap·Compare Tallahassee to another location·View the Florida building safety overview

Get notified when Electrical Permits in Tallahassee, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.