Contra Costa County, CA Building Safety: Green Building Code (2026)
Key Facts
- Diversion requirement
- 65% of nonhazardous C&D waste
- Plan due
- Before building permit issuance
- Final report due
- Before final inspection
- Exempt materials
- Excavated soil, land-clearing debris
- Multifamily EV chargers
- 10% of spaces, Level 2 EVSE
- Governing section
- Ordinance Code § 74-4.006
Summary
Contra Costa County's local amendments to the California Green Building Standards Code require permitted residential additions, alterations and demolitions to recycle or salvage at least 65 percent of nonhazardous construction and demolition debris, and to file a construction waste management plan before the county issues a building permit.
(d)Section 4.408.1 (Construction waste management) of CGBSC Chapter 4 (Residential Mandatory Measures) is amended to read: Section 4.408.1 Construction waste management. Recycle and/or salvage for reuse a minimum of 65 percent of the nonhazardous construction and demolition waste in accordance with Section 4.408.2. (e)Section 4.408.2 (Construction waste management plan) ... is amended to read: Section 4.408.2 Construction waste management plan. Submit a construction waste management plan for the project ... prior to issuance of a building permit.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Ordinance Code: Supplement 103).
Full Breakdown
Ordinance Code § 74-4.006 amends the 2025 California Green Building Standards Code (CGBSC) as adopted countywide under § 74-2.002(g). Amended CGBSC Section 301.1.1 extends the mandatory construction-waste provisions of Section 4.408 to additions, alterations and demolitions of existing residential buildings, and amended Section 301.3.2 requires the equivalent Section 5.408 diversion standard whenever a permit is required for the work. The operative numeric standard, amended Section 4.408.1, requires a project to recycle and/or salvage for reuse a minimum of 65 percent of the nonhazardous construction and demolition waste it generates.
To document that, amended Section 4.408.2 requires the applicant to submit a construction waste management plan before the county issues the building permit, identifying which materials will be diverted, whether they will be source-separated or bulk mixed, which diversion or disposal facilities and hauling companies will be used, and how the tonnage of debris will be weighed or otherwise measured. Excavated soil and land-clearing debris are exempted from the diversion count, and the enforcing agency may accept alternate reduction requirements if the owner or contractor shows that diversion facilities are unavailable near the jobsite.
Before final inspection, amended Section 4.408.5 requires a construction waste management final report with weight documentation and receipts from every receiving facility, substantiating the diverted and disposed tonnage claimed in the plan. Nonresidential projects face the parallel 65 percent standard under amended Section 5.408.1. The same amendment package separately requires at least 10 percent of multifamily parking spaces to carry fully-operational Level 2 EV charging equipment under amended Section 4.106.4.2.2.
Violations & Fines
A project cannot get its building permit without a Section 4.408.2 construction waste management plan on file, and cannot pass final inspection without the Section 4.408.5 final report and supporting weight receipts. The Building Inspection Division, as the enforcing agency, can reject inadequate diversion documentation or deny the alternate-requirements exception if the applicant fails to show diversion facilities are genuinely unavailable.
Frequently Asked Questions
Does Contra Costa County require a construction waste management plan for remodels?
What percentage of construction debris must be diverted from the landfill?
Are any materials excluded from the 65 percent diversion count?
Sources & Official References
Other rules in Contra Costa County
California rules heatmap·Compare Contra Costa County to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.