Skip to main content
CityRuleLookup

Kansas City, MO Building Safety: Green Building Code (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Code adopted
IECC 2021 with KC amendments
EV/solar conduit
Required in all new buildings
Wall insulation
R-19 minimum, Zone 4 (non-marine)
HERS/ERI score
70 under 2,000 sf / 65 larger
Max penalty
$500 fine, 180 days jail

Summary

Kansas City adopts the 2021 International Energy Conservation Code and requires new buildings to install 2-inch conduit for future rooftop solar panels and electric vehicle chargers, plus tighter wall insulation and energy performance scores for homes.

The International Energy Conservation Code (2021), promulgated by the International Code Council, is adopted and incorporated in this article by reference as if fully set forth... C405.12 Electrical for future use on new buildings with electrical services 1.Provide 2-inch conduit run up to attic for future photovoltaic systems.2.Provide 2-inch conduit run into parking areas for future electric vehicle charging stations.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 139 | Zoning and Development Code: Supplement 38).

Full Breakdown

Kansas City amended its Energy Conservation Code (IECC 2021) under Code of Ordinances Article XIV, Chapter 18. Every new building with electrical service must have a 2-inch conduit run to the attic for future rooftop photovoltaic systems and a 2-inch conduit into parking or garage areas for future EV chargers. Zone 4 wood-frame walls (except marine) must hit R-19 insulation, and single-family homes under 2,000 square feet need a HERS/Energy Rating Index score of 70 (65 for larger homes). These are citywide construction standards, not limited to city-owned buildings, and were most recently amended February 2026.

Violations & Fines

Building without following Chapter 18's amended energy code is an ordinance violation: up to a $500 fine and 180 days in jail per day of violation, plus permit and inspection failures trigger escalating repeat-offense fines under Sec. 18-15.

Frequently Asked Questions

Does Kansas City require solar-ready wiring in new homes?
Yes. Code of Ordinances § 18-367 requires a 2-inch conduit run to the attic for future photovoltaic systems in every new building with electrical service.
Is EV charger wiring mandatory for new construction?
Yes: new buildings must include a 2-inch conduit run into parking or garage areas so an electric vehicle charging station can be added later.
Does this apply only to city government buildings?
No: the IECC amendments in Chapter 18, Article XIV apply to all new residential and commercial construction citywide, not just city-owned facilities.

Sources & Official References

Other rules in Kansas City

All Kansas City rules

Compare Kansas City to another location·View the Missouri building safety overview

Get notified when Green Building Code in Kansas City, MO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.