Fresno County, CA Building Safety: Green Building Code (2026)
Key Facts
- Code adopted
- 2022 California Green Building Standards Code (CALGreen)
- Local addition
- MWELO landscape water-budget rule, Title 23 CCR Ch. 2.7
- Governing chapter
- Fresno County Code Chapter 15.22
- Enforcing office
- Public Works and Planning, Development Services Division
- Latest amendment
- Ordinance No. 23-001, February 28, 2023
Summary
Fresno County adopts the 2022 California Green Building Standards Code by reference for every new building permit issued in the unincorporated area. County Code Chapter 15.22 layers on a local landscaping rule: the state Model Water Efficient Landscape Ordinance under Title 23 of the California Code of Regulations governs irrigation and plant choices on top of the base CALGreen standards administered by the Building Official.
15.22.010 - California Green Building Standards Code adopted. The 2022 California Green Building Standards Code is adopted by reference.
(Ord. No. 23-001, § 1(Exh. 2), 2-28-2023; Ord. No. 19-025, § 1(Exh. B), 12-10-2019; Ord. No. 13-024, § 1(Exh. B), 11-12-2013; Ord. No. 11-005, § 1, 5-24-2011)
15.22.020 - Exceptions and additional provisions. A.California Code of Regulations Title 23 - Waters Division 2 - Department of Water Resources Chapter 2.7 - Model Water Efficient Landscape Ordinance (MWELO), adopted. (Ord. No. 23-001, § 1(Exh. 2), 2-28-2023; Ord. No. 19-025, § 1(Exh. B), 12-10-2019; Ord. No. 11-005, § 1, 5-24-2011)
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 51).
Full Breakdown
22 of the Fresno County Code, titled Green Building Standards Code, contains just two operative sections. 010 adopts the 2022 California Green Building Standards Code, commonly called CALGreen, by reference for all construction within the unincorporated county. That adoption folds mandatory measures on construction waste diversion, water conservation fixtures, and building commissioning into every building permit reviewed by the Fresno County Department of Public Works and Planning, Development Services Division. 7, the Model Water Efficient Landscape Ordinance (MWELO), which sets maximum applied water allowances and plant-factor calculations for new landscaping tied to a building permit.
Both sections were most recently reenacted by Ordinance No. 23-001 on February 28, 2023, which also updated the county's building code chapters to the 2022 edition cycle; earlier amendments trace back to Ordinance No. 11-005 in 2011 when the chapter was first adopted. Because Fresno County incorporates CALGreen and MWELO by reference rather than writing its own numeric green-building standard, a builder pulling a permit in the unincorporated area works from the state code text itself, checked at plan review by county building staff against the adopted 2022 edition. There is no separate county point-count or local exceedance requirement beyond the state baseline in this chapter.
Violations & Fines
Building without CALGreen-compliant plans, or landscaping a permitted project without meeting MWELO water-budget calculations, is treated as a building code violation. The Building Official can withhold final inspection sign-off and the certificate of occupancy until the required CALGreen measures and landscape documentation package are verified, and can require corrective work before recording final approval.
Frequently Asked Questions
Does Fresno County have its own green building code?
Does new landscaping need to meet a water-budget rule too?
Who enforces the green building requirements?
Sources & Official References
Other rules in Fresno County
California rules heatmap·Compare Fresno County to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.