Fresno County, CA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Fresno County Code § 15.04.080
Codes adopted
2022 CA Building & Residential Codes
Consolidated permit discount
5% fee reduction
Permit expiration
12 mo. unstarted / 6 mo. after last inspection
Work-without-permit fee
2x normal permit fee
Plan review shelf life
12 months

Summary

Fresno County adopts the 2022 California Building and Residential Codes' permit requirements under Code Section 15.04.080, letting builders combine building, mechanical, electrical and plumbing permits onto one form for a 5% fee discount. Permits expire if work doesn't start within 12 months or stalls 6 months after the last inspection.

City-specific rules exist: Clovis, and Fresno have their own building permits rules that differ from Fresno County's county-level regulations. If you live in one of those cities, check the city-specific page instead.

2022 California Building Code Section 105, and the 2022 California Residential Code, Section R105 Permits shall be amended as follows: A.Consolidated Permits. In lieu of applying for separate Building, Mechanical, Electrical and Plumbing Permits, any combination of Building, Mechanical, Electrical or Plumbing Permits may be consolidated onto one (1) permit form for each building or structure. When all required permits are obtained concurrently on one (1) application form, the permit fee will be reduced five percent (5%).

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 51).

Full Breakdown

080 amends Section 105 of the 2022 California Building Code and Section R105 of the 2022 California Residential Code to set the county's own permit procedures for building, mechanical, electrical or plumbing work in the unincorporated area. Builders may file one consolidated application covering any combination of the four permit types instead of separate applications, and combining them on a single form earns a five percent reduction in the permit fee. " The Building Official can extend that deadline up to two years from original issuance on written request, with further extensions possible at the official's discretion.

Anyone caught working after a permit lapses is issued a violation and must stop until a new permit issues; re-issuance costs half the original fee if requested within six months of expiration and no substantial plan changes were made, but past six months a brand-new permit is required at current fee-schedule rates. Plan reviews carry their own twelve-month shelf life under the same section: if no building permit is pulled within a year of the plan review's completion, the review itself expires, though the Building Official may grant a one-year extension.

Anyone who starts construction before securing the required permit faces a separate Work-Without-Permit violation fee, twice the normal permit cost for the unpermitted portion of work, on top of the standard permit fees. Applicants must submit two complete, to-scale sets of plans, including a site plan, for review, all reviewed together except as allowed for larger commercial and industrial projects.

Violations & Fines

Starting work without the required building, mechanical, electrical or plumbing permit triggers a Work-Without-Permit violation fee under Section 15.04.080(C), charged at twice the normal fee for the unpermitted portion of the work, on top of the standard permit fees, unless a new owner acquired the property without knowledge of the unpermitted work. Working under an expired permit is also a violation, and no further work may occur until the permit is reissued or replaced.

Frequently Asked Questions

Can I get one permit for a project that needs building, electrical and plumbing work?
Yes. Section 15.04.080(A) lets applicants consolidate any combination of Building, Mechanical, Electrical and Plumbing Permits onto a single form for one building or structure, and filing them together cuts the total permit fee by five percent.
How long is a Fresno County building permit valid?
A permit expires if work isn't started within 12 months of issuance or if six months pass after the last approved inspection, under Section 15.04.080(B). The Building Official can extend the deadline up to two years from the original issue date on written request.
What happens if I start construction before getting a permit?
Section 15.04.080(C) charges a Work-Without-Permit violation fee equal to twice the regular permit fee for the portion of work already completed, in addition to the standard permit fees, unless a new owner bought the property without knowing the work was unpermitted.

Sources & Official References

Other rules in Fresno County

All Fresno County rules

California rules heatmap·Compare Fresno County to another location·View the California building safety overview

Get notified when Building Permits in Fresno County, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Cities Across Fresno County