Fresno, CA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit/plan-review fees set by
Master Fee Resolution
Extra review-time fee triggered by
complex/changed plans (§109.5)
Utility hookup barred until
code compliance confirmed (§112.1)
Electrical meter required operational
before final electrical inspection
Temporary power allowed with
security agreement + possible deposit
Appeals go to
Building Standards Appeals Board

Summary

Every Fresno building permit fee is set by the City's Master Fee Resolution, with an added charge when plans are unusually complex or get changed enough to need extra review time. Municipal Code § 11-102 also blocks utility hookups, and any temporary construction power, until the Building Official signs off.

109.2 Schedule of Fees. All fees assessed in accordance with the provisions of the Fresno Building Code shall be set forth in the City of Fresno Master Fee Resolution. 112.1 Connection of Service Utilities. Utility connections shall not be permitted until compliance with the provisions of the Fresno Municipal Code as set herein. Electrical Meter: Electrical meters shall be required to be in place and operational prior to final electrical inspection to facilitate testing and acceptance of the entire system. Installation of devices, fixtures, and wiring shall be completed and in working order for testing purposes.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 54).

Full Breakdown

2 so that every fee charged under the Fresno Building Code, plan review, permit issuance, and related charges, is set out in the City of Fresno Master Fee Resolution rather than the code itself. 5 adds a mechanism for extra charges: if plans are unusually complex, incomplete, or get changed so the Department needs more plan-review time than the base fee assumed, the City can charge an additional fee under the Master Fee Resolution's special-services-request provision, except that for commercial projects with multiple buildings sharing identical footprints and floor plans, the Building Official sets the review fee to match actual circumstances and reasonable Department costs.

1 bars any utility connection until the project complies with the Fresno Municipal Code, and specifically requires the electrical meter to be installed and operational before the final electrical inspection, with all wiring, devices, and fixtures complete and working for testing. 0 of the California Plumbing Code; early occupancy under a Temporary Certificate additionally requires the owner to sign a security agreement and, unless waived by the Building Official, post a deposit sized to guarantee the unfinished work gets completed.

Violations & Fines

Connecting utility service, or occupying a building, before the Building Official has authorized it under §§ 112.1-112.2 is a code violation, and § 114.4.1 makes any violation of the Fresno Building Code a misdemeanor. Fee disputes and denials of a special-services fee request can be appealed to the Building Standards Appeals Board under § 113, following the same appeal path as other Building Official determinations.

Frequently Asked Questions

Where can I find Fresno's building permit fee amounts?
They're not printed in the building code itself. Section 109.2 of the Fresno Building Code sets every permit and plan-review fee by reference to the City of Fresno Master Fee Resolution, which the Building Official applies project by project.
Can Fresno charge more than the base permit fee for my project?
Yes, if your plans are unusually complex, incomplete, or get changed enough to need extra review time. Section 109.5 authorizes an added fee under the Master Fee Resolution's special-services provision, though commercial projects repeating an identical building footprint get a fee the Building Official sets to match actual review costs.
Can I turn on utilities at my Fresno job site before final inspection?
Only with the Building Official's approval. Section 112.2.1 lets the Building Official permit construction-phase utility use if it creates no hazard and meets Article 590 of the California Electrical Code or section 1208.0 of the Plumbing Code, and § 112.2 allows a Temporary Certificate for early occupancy backed by a security agreement.

Sources & Official References

Other rules in Fresno

All Fresno rules

California rules heatmap·Compare Fresno to another location·View the California building safety overview

Get notified when Building Permits in Fresno, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.